Laserfiche WebLink
. Fees to be Char ed YES NO <br /> • Permit <br /> � Plan Review V���' <br /> State Surcharge �/' <br /> Investigation Fee � <br /> SAC—Number of SAC Units j <br /> Other(specify) i�-� <br /> S uare Foota e $ er S uare Foota e <br /> Basement X = $ <br /> 1� Floor X = $ <br /> 2nd FIo01' X = $ <br /> Garage X = $ <br /> Estimated Construction Value: $ ��1�/,/[,f 1/� � . <br /> Orono Inspections Required Work Requiring Separate Permits <br /> Footing • � Site Plumbing 0 Grading/Filling <br /> Poured Wall Silt Fence/Erosion Control � Mechanical � Fire <br /> Foundation Survey � Hardcover Removal � Fireplace �Water Connection <br /> � Framing � Other(specify) 0 Masonry ��Sewer Connection <br /> �Waterproofing/Drain tile ��Mfg. � � Lawn Irrigation <br /> � Foundation Waterproofing � Other(specify) � Landscaping <br /> Framing � <br /> � Insulation Y ' <br /> As-Built Survey <br /> ' inal <br /> Lathe Required State Permits <br /> 0 Other(specify) � + <br /> � Well Electrical <br /> �' <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> �See Builder Acknowledgement Form <br /> � � Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: October 2016 <br /> v:\forms�plan review checklist 10-2016.docx <br />