My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-00146 - new structure
Orono
>
Property Files
>
Street Address
>
D
>
Dickey Lake Drive
>
701 Dickey Lake Drive - 34-118-23-22-0005
>
Permits/Inspections
>
2017-00146 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:56:04 PM
Creation date
5/24/2017 7:59:16 AM
Metadata
Fields
Template:
x Address Old
House Number
701
Street Name
Dickey Lake
Street Type
Drive
Address
701 Dickey Lake Drive
Document Type
Permits/Inspections
PIN
3411823220005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rhvac'-Residential&Light Commercial HVAC Loads Elite Software Development,inc. <br /> � Sabre Plumbing&Heating � 701 Dickey Lake Drive Orono Pfingsten Residence <br /> PI mouth MN 55447 Pa e 2 <br /> Pro'ect Re ort <br /> Generai Pro'ect Information <br /> Project Title: 701 Dickey Lake Drive Orono Pfingsten Residence <br /> Designed By: Josh Gray <br /> Project Date: Friday, January 27, 2017 <br /> Client Name: Gonyea Homes <br /> Company Name: Sabre Heating And A/C <br /> Company Representative: Josh Gray <br /> Company Address: 15535 Medina Road <br /> Company City: Plymouth, Mn 55447 <br /> Company Phone: 763-473-2267 <br /> Company Fax: 763-473-8565 <br /> Company E-Mail Address: josh.gray@sabreheating.com <br /> Desi n Data <br /> Reference City: Minneapolis, Minnesota <br /> Building Orientation: Front door faces East <br /> Daily Temperature Range: Medium <br /> Latitude: 44 Degrees <br /> Elevation: 834 ft. <br /> Altitude Factor: 0.970 <br /> Outdoor Outdoor Outdoor Indoor Indoor Grains <br /> �Bulb Wet Bulb B�L,��1 Rel.Hum � Bulb Difference <br /> Winter: -15 -12.38 n/a 30% 72 29.40 <br /> Summer: 88 73 50% 50% 75 35 <br /> Ch Fi ures <br /> Total Building Supply CFM: 1,235 CFM Per Square ft.: 0.298 <br /> Square ft. of Room Area: 4,142 Square ft. Per Ton: 1,506 <br /> Volume(ft')of Cond. Space: 37,278 <br /> Buil in Loads <br /> Total Heating Required Including Ventilation Air: 50,579 Btuh 50.579 MBH <br /> Total Sensible Gain: 27,282 Btuh 83 % <br /> Total Latent Gain: 5,729 Btuh 17 % <br /> Total Cooling Required Including Ventilation Air: 33,012 Btuh 2.75 Tons(Based On Sensible+ Latent) <br /> Notes . <br /> Rhvac is an ACCA approved Manual J and Manual D computer program. <br /> Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. <br /> All computed results are estimates as building use and weather may vary. <br /> Be sure to select a unit that meets both sensible and latent loads according to the manufactu�er's performance data at <br /> your design conditions. <br /> M:\...\701 Dickey Lake Drive Orono PFINGSTEN.rh9 Saturday, January 28, 2017, 11:01 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.