Laserfiche WebLink
.� <br /> % <br /> CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> GENERAL INFORMATION <br /> 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be <br /> reviewed and a permit will be issued within 2 working days. <br /> 2. Permit cards will be sent by retum mail after a review is completed. PER�ti1ITS ARE NOT VALID UNTIL <br /> YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON <br /> THE JOB SITE. <br /> 3. Mechanical Desiens - Complete calculations, details and specitications are required for each heating, <br /> ventilation, humidification-dehumidification, and air conditioninQ installation including heat loss/heat gain <br /> calculation, design temperatures, equipment ratings and identification as to rype, manufacturer and model. <br /> Data shall be presented on form provided. Identification of and specifications for water heating equipment <br /> sh�:ll also be provided. <br /> 4. V6:;���� any new construction or remodeling is involved, a separate buildins permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements. <br /> 6. All work must be inspected(rough-in and final). Call 249-4600. 24-hour notice required. <br /> 7. House Heating Test Record must be submitted before fmal. <br /> Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 249-4600. <br /> Please check one: �New Addition Repair Replace <br /> Residential Commercial <br /> JOB SITE: �J'7�� /!/i���'`T�t/ Zip: <br /> Owner's Name: C,h�;��� c',��5� Telephone 1\umber: <br /> , <br /> Mailing Address: City: Zip: <br /> Contractor's Name � • ,�� - ;s Telephone Number: ��,� �3�51y� <br /> Mailing Address: ���/5� �� �� . City:,�L y�or��-� Zip: �s-y�1 <br /> SYSTEM DESCRIPTION <br /> HEATING SYSTEMS <br /> Quantity: <br /> Make: ��a�s�i�,e� <br /> ModeL• ���/y1� �j�j�VS' <br /> Fuel: /�s�Tv,e,�L <br /> Flue Size: ' ' <br /> Input BTUs: a���� <br /> Output BTUs: <br /> CFM: <br /> COOLING SYSTEMS <br /> Quantity: <br /> Make: <br /> Model: <br /> Tons: <br /> H. Power <br />