My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-012172 - new residence
Orono
>
Property Files
>
Street Address
>
L
>
Livingston Avenue
>
3701 Livingston Avenue - 17-117-23-34-0072
>
Permits/Inspections
>
1999-012172 - new residence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:38:34 PM
Creation date
5/18/2017 2:12:54 PM
Metadata
Fields
Template:
x Address Old
House Number
3701
Street Name
Livingston
Street Type
Avenue
Address
3701 Livingston Avenue
Document Type
Permits/Inspections
PIN
1711723340072
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> �-�ct 02 00 09:47a 320-864-5672 p. l � <br /> �� <br /> �I$$ITS �N�IN��IN� <br /> STRUCTUfiAL ENGINEERINCi•BUILDINO DESIGN 735 ttlh SI.E.-3uits 204 <br /> GlanCoa,A�IN 56338 <br /> (320)884�5G42 <br /> F/1X(320)8645672 <br /> September 13,2000 � �, ">u ,:. �,.,� � K� 7i�, ;,,�:.. ,.rx;f,;,.�;_.,, ,,,}�,y ' <br /> y �t <br /> �� <br /> '� r <br /> �. <br /> i �. <br /> i'� I� <br /> n Pfcsident <br /> I�4r. John Gleaso , <br /> Ea le Cres <br /> t Homes Inc. <br /> � <br /> , <br /> P.O. Box 47333-0333 ' <br /> Plymouth, MN 55447 ' " <br /> .. ��� ���'.��,:.�: ;" -.�x,� �1�"� <br /> RL-': Garage Door Headers for 3 bedroom Townhomes <br /> Plan #99477-3 � <br /> Dear lohn: <br /> Af'ter reviewing my leaer of September 7,we discussed alternates to the use of a steel channel <br /> for support of the loads above. (Plr,�se note that itcm�1 of the September 7 letter incorrcctly <br /> allows 4 plies of 11 7/8"LVL. That should have read 4 plies of 18"LVL.) <br /> From our discussions, you have indicated you would like to add 2 plies of 18"LVL to die <br /> existin�3-ply�LVL t�esm. I have evaluatod the beam nnd determined that thc addition of 2 plies <br /> of 1,VI will bc adeqvate under the following conditions: <br /> • F,r•aluate the structure(especially the existing 3-ply LVL)for any defects. <br /> • Jack up the header slightly to remove some of the deflection if possible. <br /> • Ensure that the 3 plies aze currently pmperly fastened wgether—add nails to the inside ply if <br /> required to provide 3 rows of 16d common nails at 12"on center in each row. <br /> • Install2 plies of 18"LVL(one ply at a time)nailing each ply with 3 rows of 16d common <br /> n�ils at 12"on center in each row. Note"en9ure contact at the top,with framing above(shim <br /> i f nccessary);trim 2x6 plate as required for flush installation. <br /> • E3ott all 5 plies using 3 rows of'/�"bolts(with washers)at 12"on centor in each raw. <br /> • Provide support for the ends of the LVL,to the foundation below. <br /> Note that the columns at the ends of the 5-ply beam must support as much as 25,000 lbs. The <br /> foundation and footings must be capable of supporting those loads. <br /> � �� � - . <br /> �- -�- ....� � �. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.