My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4240
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7399
>
Reso 4200 - 4299 (November 23, 1998 - May 24, 1999)
>
Resolution 4240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2017 1:16:23 PM
Creation date
5/18/2017 1:16:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� o� <br /> 0 0 <br /> �d � CITY of ORONO <br /> � ti <br /> '�' RESOLUTION OF THE CITY COUNCIL <br /> ��'9k'E gOg'�G NO. � � � � <br /> S <br /> 7. The subdivider shall dedicate drainage easements over the wetlands, ponding . <br /> area, and the portion of the storm sewer which is located outside of the right-of- <br /> way. The subdivider shall grant flowage and conservation easements over all <br /> designated wetlands. <br /> 8. The subdivider shall dedicate an additional 7' of right-bf-way along CSAH 15 <br /> (Shoreline Drive) for a total of 40' from the centerline. This area will be used <br /> to accommodate utilities, snow storage, signage, pedestrian/bike trail or other <br /> public uses. <br /> 9. The subdivider will obtain appropriate permits from Hennepin County prior to <br /> construction within the County right-of-way. All areas within the County right- <br /> of-way disturbed during construction will be restored. <br /> 10. The subdivider shall protect all trees and wooded areas that are to be preserved <br /> by fencing at the drip line prior to commencing construction. Good construction <br /> management and arborist practices shall be observed to minimize the potential <br /> for infection and spread of oak wilt. <br /> 11. The subdivider shall configure and construct the stormwater management pond <br /> as a natural feature. The perimeter of the pond shall be treated as a natural <br /> edge and planted with appropriate native grasses, deciduous trees and shrub <br /> masses. <br /> 12. The subdivider shall minimize grading impacts on the site. Low, curved <br /> retaining walls shall be used to lessen grading impacts to preserve natural <br /> features. The retaining wa11s shall be constructed of a permanent material that <br /> blends with the natural setting. Timber walls shall not be allowed. <br /> 13. The subdivider shall submit an internal walkway layout that is compatible with <br /> the wooded area. Trail connections constructed of an all-weather material shall <br /> be provided between Block 2 and 3 and Block 2 and 4 walkways. The trails <br /> shall follow the existing trail alignments. A paved 8' trail linkage from the <br /> project area to CSAH 15 (Shoreline Drive) shall be provided. The trail plan <br /> shall be reviewed and approved by the Public Services Director. <br /> Page 7 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.