My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-13-1981 Council Minutes
Orono
>
City Council
>
Minutes
>
1980-1989
>
1981
>
07-13-1981 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2015 11:53:13 AM
Creation date
4/23/2015 11:53:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING OF THE ORONO COUNCIL, JULY 13 , 1981 Page 7 <br /> An inspection conducted July 8 , 1981, at the above KENNEL LICENSE <br /> subject property for kennel license� revealed the Ms. Koltes <br /> following: (Continued) <br /> 1 . There were four dogs on the property. Two <br /> on the deck, one in the house , and one <br /> running at large . <br /> 2 . No one was at home . One of the conditions <br /> of previous kennel license was that dogs <br /> would be kept in the house when no one was <br /> home . <br /> 3 . Al1 four dogs have licenses, although on <br /> previous inspections, owner has told me that <br /> the fourth dog (white sheepdog mix) is just <br /> visiting. Previous license was for three dogs. <br /> 4 . The property is in one-half acre zoning district. <br /> The area of the subject property is 28 , 900 sq. ft. <br /> The property is owned by Jacci Segner and rented <br /> to Ms. Koltes. <br /> 5 . Also a plat map showing locations of residents <br /> on both petitions. <br /> End of inemo <br /> Paurus moved, Hurr seconded, to authorize staff to <br /> draft a resolution of denial for the kennel license <br /> for Ms. Mary Koltes, 2300 Bayview, with a copy sent <br /> to Ms. Koltes for review and an opportunity to respond. <br /> Motion, Ayes (4 } - Nays (0 ) . <br /> Glenn Cook, City Engineer, reported to the City TRAFFIC SIGNAL <br /> Council on the progress of the traffic signal at #12 & Old Crystal Bay <br /> Highway #12 and the Old Crystal Bay Road stating <br /> that work will begin this week. <br /> Glenn Cook, City Engineer, reviewed with the City SAUR SEWER <br /> Council his letter regarding the Sauer property Highwod Sewer Project <br /> in the Highwood sewer area dated July 8 , 1981 , <br /> which states : <br /> "The placement of storm sewer on the Sauer property <br /> would require 40 feet of 24" CMP plus one catch <br /> basin as discussed. The estimated cost of material <br /> is $900 if the work is to be completed by the City. <br /> The estimated cost to include the work in the contract <br /> with the sewer construction is $2 , 500 . The above <br /> figures do not reflect any surface restoration after <br /> the pipe is placed. " <br /> (Continued) <br />
The URL can be used to link to this page
Your browser does not support the video tag.