Laserfiche WebLink
. , <br /> " Page 9 <br /> J <br /> Mr . Todd fieglund <br /> March 16 , 1981 <br /> Page 2 , <br /> As I see it , these are the concerns: <br /> 1. Keller property <br /> 2 . Identify all available units and allowable GPM, not only for <br /> mai.ztenance and operation costs, but also to determine future <br /> allowable capacities. <br /> 3 . Hackberry area - 24 resdiences <br /> 4 . Proportion all costs according to present contributing units <br /> and future available units <br /> S . Maintain 24 GPM sewage flows from Medina <br /> 6 . Identify pipe D and its future forever <br /> See you at 6 : 45 A.M. , Wednesday, March 18 , 1981 for breakfast. <br /> Thanks. <br /> Sincerely, <br /> !�/ <br /> Walt R. Ben n <br /> Cit Administrator <br /> cc": Lyle Swanson - McCombs-Knutson Engineering <br />