Laserfiche WebLink
Page 7 <br /> ORONO SEWER SYSTEM <br /> 1980 USER RATES <br /> Item Computation Rate <br /> MWCC Total Charge $117,308.35 = 163,100,000 gal. $0.72/1,000 gal. <br /> Local 0 & M 87,704.00 = 163,100,000 gal. 0.54/1,000 gal. <br /> Depreciation 13,786.00 = 163,100,000 gal. 0.08/1,000 �al. <br /> Operating Rate $1.34/1,000 gal. <br /> Administration $ 9,211.00 = 1,415 connections $6.50/yr. or 1.65/qtr. <br /> 1980 SEWER RATE PER UNIT <br /> Quarterly Charge <br /> MWCC Charge 25,000 gal. @ $0.72/1,000 gal. $18.00 <br /> Local Charge 25,000 gal. @ 0.62/1,000 gal. 15.50 <br /> Administration 1.65 <br /> Rate per unit $35.15/quarter <br /> Operating Rate = $1.34/1,000 gal. x 125%* $1.68 <br /> Rate per 1,000 gal. - Water meter rdg. $1.68/1,000 + <br /> $1.65/qtr. <br /> RATE COMPARISON • <br /> Per Unit Per 1,000 �al. <br /> , �xisting,Rates 22.75 1.50/1,000 gal. <br /> Proposed Rates 35.15 1.68/1,000 gal. <br /> Percent Change 5570 127 <br /> * Standard rate increased 25 percent to reflect inflow/iafiltration where users <br /> are billed for sewage flow on water meter readings. <br /> Page S. <br />