Laserfiche WebLink
' � • • Tc)cph�m� 4-.,�:i:,' <br /> , <br /> _ - � . Page 34 <br /> . . f� �- ^� C I��Tt' o�� ���i�T 0 <br /> � <br /> - ::��_,.:_-. <br /> ''� � - - � Post Uffice Box 66•Crystal Ba�•, Minnesota 55323•Municipal OfficeF <br /> - :�.:_' " •� <br /> e '� <br /> - � On ihe North Shore oj Lake Minnetonka <br /> ~� �:- <br /> .� '�.� '� <br /> _��: <br /> April 10 , 1980 <br /> Metropolitan �:aste Control Commission <br /> 350 Metro Square Building <br /> St . Paul , N,innesota 55101 <br /> R�: 201 Facilities Plan Systems Overview - <br /> Preferred Plan - Mapl'e Plain Sewage Treatnent Plant <br /> City of Orono <br /> Ladies and Gentlemen : <br /> On March 28 , 1980 , we received a redraft of the 201 Facilities <br /> Plan Overview - Preferred Plan . The City Council , planner , <br /> engineer and attorney had previously studied at length the <br /> prior drafts of that plan and the impact of certain portions <br /> of that plan on the future of the City of Orono and the water- <br /> shed in which it is located . <br /> On page II-2 of the plan, it shows that although the 208 plan <br /> recommended the expansion with phosphorous removal of the <br /> Maple Plain Sewage Treatment Plant , the 201 plan recommended <br /> the construction of an interceptor from the Maple Plain Sewage <br /> Treatment Plant across ru�ral Orono to the Long Lake PS and <br /> thence to tYie Blue Lake Treatment Plant. This alternative <br /> was also discussed on pages II-8 , III-2 , and IV-2 of the <br /> plan. - � <br /> We have previously met on several occasions with the MWCC and <br /> PCA staff and documented our objections to the construction of <br /> a $1.5 million interceptor across rural Orono. <br />