My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-1980 Council Minutes - pgs misnumbered
Orono
>
City Council
>
Minutes
>
1980-1989
>
1980
>
03-10-1980 Council Minutes - pgs misnumbered
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2015 1:23:48 PM
Creation date
4/22/2015 1:23:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING OF' TIIE ORONO COUNCIL, MARCH 10 , 1980 Page 7 <br /> � This proposal was reviewed by the committee on CDBG APPLICATION* <br /> February 12 , 1980 and approved as submitted. In (Continued) <br /> order to complete the application, the Council <br /> must now adopt a resolution making formal application <br /> for the funds. <br /> I recommend adoption of the attached resolution. <br /> Council Meeting - March 10 , 1980 <br /> Butler moved, Hurr seconded, to adopt Resolution RESOLUTION #1122* <br /> #1122 , A Fesolution Requesting Approval Of Year CDBG Funding - Year VI <br /> vz cDBc Funding. r�otion, A��es (4) - Nays (o) . <br /> Mr. Vern Genzlinger, Chief Engineer for the Design ARCOLA BRIDGE <br /> Division of Hennepin County, and Mr. Bearg, represent- <br /> ing Minnetonka Beach Council, were present to <br /> discuss Hennepin County ' s plans to reconstruct the <br /> Arcola Bridge. Mr. Genzlinger presented final <br /> plans showing the intended improvements. The Hennepin <br /> County Public Works Department plans to let bids <br /> on April 23 , 1980 and there are 60 planned working <br /> days to complete the project. The driving surface <br /> shall be 48' , overall width 57 ' 4" , nlus 2 ' and 3 ' <br /> sidewalks compared to the following figures supplied <br /> by John Gerhardson, Public Works Coordinator: <br /> Length 552 ' 6" <br /> Width (Driving Surface) 48 ' <br /> Sidewalk - west bound 3' <br /> Sidewalk - east bound 4 ' <br /> The railing base uses approximately one f_oot of <br /> the sidewalk. <br /> Mr. Genzlinger continuec� by stating that federal <br /> funding is not available and will not be used <br /> for this project. County State Aid funds are <br /> available which means, the Hennepin County #110 <br /> project will be eliminated. The total project <br /> cost will be approximately $1, 000 , 000 . <br /> Mayor Van Nest: It is irresponsible to consider <br /> rebuilding a four-lane bridge on a two-lane road. <br /> Priorities are not being utilized. It is the <br /> objective of the City of Orono and Minnetonka <br /> Beach not to encourage or approve of a four-lane <br /> structure that would further encourage Hennepin <br /> , County to widen Hennepin County #15. We were assured <br /> that the County #110 project north of Mound would <br /> be continued for study and funding. Adequate two- <br /> lane, not four-lane structures are the wishes of <br /> our citizens when planning local traffic needs in <br /> the Minnetonka area. (Continued) <br />
The URL can be used to link to this page
Your browser does not support the video tag.