Laserfiche WebLink
From:Christine Mattson <br /> Sent:Thursday,June 04, 2015 2:53 PM <br /> To: 'Curt Swanson'<curt@swansonhomes.com> <br /> Cc:'Mike K'<MikeK@swansonhomes.com>; 'anthonykuznik@hotmail.com'<anthonvkuznik@hotmail.com>; Melanie <br /> Curtis<MCurtis@ci.orono.mn.us> <br /> Subject: 1065 Linden Lane/#2013-01293 <br /> curt, <br /> We have reviewed the as-built survey submitted and made a site visit to the property. We have made the following <br /> comments. Please provide an updated as-built survey addressing the comments below: <br /> • Driveway Width. The driveway was proposed to be 20' in width at Linden Lane which meets City <br /> requirements. The as-built shows the driveway width to be 23' at Linden lane. The driveway width must be <br /> adjusted to the maximum allowed 20'width. <br /> • Tiered Retaining Walls. The walls at the Southeast and North corner of the house appear to require an <br /> engineered design. Tiered walls are considered one wall unless they are separated by twice the height of the <br /> higher wall. Walls 4'or taller required engineered plans. Please submit engineered plans for the tiered walls for <br /> our engineer to review. <br /> • Grading. The approved building permit survey dated 12-27-13 proposed grading which directed water away <br /> from the property to the North. A land alteration permit was issued on 11-18-14 which proposed a berm <br /> between the house and Linden Lane and also modified the grading to north,continuing to direct water away <br /> from the property to the North. The as-built survey and site visit revealed the topography on the north side of <br /> the property is currently directing water directly to the property to the North. The topography must be changed <br /> to the approved grading plan dated 11-18-14 or modified to keep water from draining onto the property to the <br /> North. Make the necessary changes to the property and submit an updated as-built survey showing the changes <br /> for our review. <br /> We continue to hold a$10,000 escrow. Once the above items have been submitted,corrected and approved we will <br /> refund the escrow money. If you have any questions, please don't hesitate to contact us. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 2750 Kelley Parkway I Orono I MN � 55356(physical address) <br /> PO Box 66 � Crystal Bay � MN I 55323-0066(mailing addressJ <br /> '� 952.249.4620 � 8 952.249.4616 <br /> �cmattson@ci.orono.mn.us � � www.ci.orono.mn.us <br /> Summer Office Hours: (Monday, May 18 through Friday,August 28,2015) <br /> Monday-Thursday: 7:30 am to 5 pm <br /> Friday: 7:30 am to 11:30 am <br /> OUR OFFICE WILL BE CLOSED: Friday,July 3, 2015 <br /> 3 <br />