My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-11-1979 Council Minutes
Orono
>
City Council
>
1979
>
09-11-1979 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2015 12:32:45 PM
Creation date
4/22/2015 12:32:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� Telephone 973-7357 <br /> ' � Page 20 <br /> Y����' - <br /> - _Y:� � � CITY of ORONO <br /> .' q�(:._ ., -J.-� <br /> Post Office Box 66•Crystal Bay, Minnesota 55323•Municipal Officea <br /> .. ;t��� - <br /> `• On the North Shore of Lake Minnetonka <br /> ;.a - • • <br /> August 31, 1979 � <br /> rir. Bernard J. Harrington <br /> Director of Engineering <br /> P4etropolitan Waste Control Commission <br /> 350 Metro Sc�uare Building � <br /> 7th & Robert Streets <br /> St. Paul, Piinnesota 55101 <br /> Dear t7r. Harrington: , <br /> Enclosed please find a draft of our prelir_iinary engineering report <br /> for the City of Medina, P4edina-Mornin_qside area sanitary sewer <br /> and an agreer►ent as you rec�uested in your letter dated Auc�ust 13, <br /> 1979. <br /> In reviewing ��our letter of August 15, 1978 , it states that the <br /> rietropolitan Council requested the following information before <br /> they would cor.�plete their revie�a of Orono' s Comprehensive Sewer <br /> Plan: <br /> l. Orono should further investigate the Metropolitan jdaste Control <br /> Comr►ission Alternative S�aste r'Ianagerlent Study. <br /> 2. Orono should include a project to service the Hackberry Hills <br /> area. _ <br /> It appears that the Alternative I4aste Management Study does not <br /> include dense areas in Orono that could be classified as future <br /> problem areas. �ae have been inforr.ied that assistance is not <br /> available to us in Orono, but the Medina-Piorningside are� does <br /> qualify. <br /> In reviewing condition #2, we request your support in finalizing <br /> the proposed sewer construction to the �Sedina-Morningside area <br /> which will also satisfy the Hackberry Hi.11s problem. <br />
The URL can be used to link to this page
Your browser does not support the video tag.