My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-22-1979 Council Minutes
Orono
>
City Council
>
Minutes
>
1970-1979
>
1979
>
05-22-1979 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2015 12:08:24 PM
Creation date
4/22/2015 12:08:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULI�R i'iEETIPIG OF THE OROP70 COUI•1CIL, 24AY 22 , 19 79 Page 5 <br /> 1. �xisting driveway to be replaced with ne�•� �ublic SUBDIVISIOPd <br /> road and cul-de-sac in center of peninsula. 1340 Baldur Park Road <br /> Right-of-way to be dedicated 50 ' �vide ���ith a (Continued) <br /> 50 ' diameter cul-de-sac on end. <br /> Planning Conmission recorunended c�ravel surface <br /> because of lakeshore proximity but Public T9orks <br /> Supervisor and Planner recomr:►end standard 18 ' <br /> paved surf_ace (to match existing Baldur Park <br /> Road) for rnaintenance purposes. If hardcover <br /> , becomes a concern, the cul-de-sac could be <br /> ' r.loved east with longer private driveways beyond. <br /> One corunon driveway to serve Lots 1 & 2 (and <br /> Lot 3 if cul-de-sac is moved) beyond the cul- <br /> de-sac. <br /> The Council should also consider requirinc� the <br /> developer to participate in paving the 200+ feet <br /> of gravel road between his proPerty and the end <br /> of paving on Baldur Park Road. <br /> 2 . Connection of all lots to municipal sewer: <br /> Existing house by August l, 1979 (deadline for <br /> all existing se�vered properties as previously <br /> notified) and stubs provided for new sites. <br /> 3. Payment of $225 sewer connection charc�es for <br /> two ne�v sites v�ith building permits <br /> 4. Payment of �ark dedication fee per schedule. <br /> ($440 X 2 = $8801 . <br /> 5. Removal of existing shed prior to final plat <br /> approval and rer►oval of existing garage (Lot 3) <br /> prior to building permit for new house. <br /> 6. Completion of the road and sewer improver:lents <br /> by the developer prior to final plat approval, <br /> or execution of a developer' s agreeMent to <br /> complete the work caithin one year. � <br /> 7. Planning Corunission recor.unended the dock location <br /> for Lot 3 to be an outlot on the north side of <br /> the peninsula but staff feels that there is <br /> sufficient roor.i to have a dock on Lot 3 without <br /> needing an outlot and without needing variances <br /> for dock setback or construction in the marsh. <br /> All lots are riparian. <br /> Council Meeting - Psay 22 , 1979 <br /> tZr. Petersen was present to discuss his plans for <br /> the subdivision at 1340 Baldur Park Road. <br /> *Zr. Ted IIoer, 1392 naldur Park Road, caas also presen�t <br /> and presented the City Council with a letter concerning <br /> the subdivision. � (Continued) <br />
The URL can be used to link to this page
Your browser does not support the video tag.