Laserfiche WebLink
e� °� ' <br /> �� <br /> 0 0 <br /> :°�:��:�:::� : CITY of UlZONO► <br /> a �����'��� - �. <br /> \ � t��;,. � �1��'.��• �, Municipal Offices <br /> � <br /> �. ��;%.;;�� J`�: ,ti, <br /> �� r`' !��`�� '�;ir�`a� G Street Address: Mailing Address: <br /> �� � '`�����`��``' � P.O. Box 66 <br /> �\��9 ''�`x°�' 4�� 2150 Kelley Parkway <br /> x�'/ Orono, MN 55356 Crystal Bay, MN 55323•0066 <br /> To: The Current Owner of Address '�� � � �- Q �=C <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The.onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes _�,_ <br /> No <br /> If yes,please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attomey for <br /> legal action. <br /> System Identif as Non-Compliant <br /> Yes <br /> No <br /> If yes, system must be brought into compliance by: . <br /> December 31,2007 � <br /> December 31,2010 � <br /> Other ' <br /> Septic Tank(s ump out Needed <br /> Yes <br /> No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s)were last pumped out on <br /> 'Z—1� �O� . The tank(s) should be cleaned through the manhole and <br /> not through the inspection pipes,this allows for proper cleaning. <br /> Comments: <br /> �, �,,�'.�.� � 5-d� <br /> Inspecto�r'^� Date of Inspection <br /> Telephone(9�2)249-4600 • Fa�: (952)249-4616 <br /> www.ci.orono.mn.us <br />