My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: Stubbs Bay sewer project
Orono
>
Property Files
>
Street Address
>
L
>
Leaf Street
>
398 Leaf Street - 04-117-23-23-0007
>
Correspondence
>
Re: Stubbs Bay sewer project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:09:51 PM
Creation date
5/2/2017 1:51:40 PM
Metadata
Fields
Template:
x Address Old
House Number
398
Street Name
Leaf
Street Type
Street
Address
398 Leaf St
Document Type
Correspondence
PIN
0411723230007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;Rathryn Anderson <br /> 'July 5, 1991 <br /> Page 2 <br /> The Council has considered what standards would be appropriate <br /> for allowing exemptions for properties currently within the <br /> proposed project boundaries. Properties with at least 2 acres <br /> and providing testing to show that they have primary and <br /> alternate drainfield sites available, would be considered for <br /> exemption as long as other properties served by their <br /> neighborhood lateral had similar conditions. Your lot is 1.0 <br /> acre in area, and while your system may be functioning <br /> adequately, the properties directly to your west and north have <br /> problem systems, are both significantly less than 2 acres in <br /> area, and likely will need expensive repairs if the sewer project <br /> does not serve them. <br /> You mentioned that perhaps Cygnet Place should be included in the <br /> �roject. While Cygnet Place will possibly •need City sewer in the <br /> uture, it is not included in the current project. Including <br /> Cygnet Place at this time would not significantly decrease the <br /> overall project cost for the rest of the Stubbs Bay area. <br /> However, the Council is considering whether it is appropriate to <br /> defray a portion of the trunk cost now, expecting to recoup that <br /> investment at a future time when the Cygnet area is served. This <br /> would have the effect of reducing your assessment to some degree. <br /> At the June 24th City, Council meeting, the City Engineer was <br /> directed to update his previous feasability study, to indicate <br /> any changes in estimated project cost since his last update. <br /> City staff is working with the Engineer to ensure the most cost <br /> effective system design. The City Council is wel 1 aware that the <br /> cost of this project may be prohibitive for a share of the <br /> residents in the area. <br /> Again thank you for your letter stating your concerns. We will <br /> try to keep Stubbs Bay area residents informed as discussions on <br /> the project continue. If you have further questions, please feel <br /> free to contact me at 473-7357 . <br /> Sincerely, r <br /> ir � <br /> , �: � <br /> �-�.�.�� Q�►���' <br /> a k E Ber rdson_ � <br /> ' City Administrator <br /> MEB/lsv <br /> � -� - <br />
The URL can be used to link to this page
Your browser does not support the video tag.