My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-25-1978 Council Minutes
Orono
>
City Council
>
Minutes
>
1970-1979
>
1978
>
07-25-1978 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2015 10:36:29 AM
Creation date
4/22/2015 10:36:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Show annotations
View images
View plain text
. ��� <br /> REGULAR MEETIPdG OF THE ORONO COUNCIL, JULY �, 1978 - Page 2 <br /> P�ir. Gaffron stated that the program is 50$ SEPTIC SYSTEM REPORT <br /> public relations and educating the public. (Continued) <br /> He has completed 100 septic system inventory <br /> cards out of approximately 900-1000 systems. <br /> Councilmember P4assengale suggested that the - <br /> par,lphlet be reviewed by the City Engineer <br /> and the City Attorney before handing out. <br /> t4r. Gaffron suggested a change in the code to <br /> require septic system installers to attend <br /> courses or seminars to become more knowledgeable <br /> in the proper installation of systems. <br /> 2�Is�. Alan Olson, City Planner, entered into the SUBDIVISION <br /> record the request for a subdivision for Colpepper 40 Orono Orchard Road N. <br /> Land Company (Neslund) , 40 Orono Orchard Road rlorth, #�306 <br /> dated September 12, 1977, which states: Colpepper Land Cor.lpany <br /> This request is a revision of previous requests <br /> for division of this property. This proposal <br /> included 17 two-acre lots consistent with the <br /> zoning requirements for the area. <br /> The engineer for this project is McCombs-Knutson <br /> Associates which means that the City will have to <br /> retain an independent eng�ineer for review of the <br /> subdivision proposal. This cost will be allocated <br /> to the developer as required by our ordinances. <br /> Hank :duhich asked Council if there might be a <br /> problem with this proposal as it was prepared by <br /> our engineering firm. After Dick Benson talked <br /> with t�'ir. Knutson, he informed me it would be <br /> acceptable because it was understood that the City <br /> would have to consult some other engineer for <br /> review of the proposal. <br /> The engineer has been requested to submit a chart <br /> showing the total project area, and the area <br /> designated as wetlands. In addition, each lot <br /> will be listed with total area, dry buildable <br /> area, and wetland area and soils information will <br /> be submitted showing the suitability for on-site <br /> septic systems. - <br /> Copies of this application have been sent to <br /> Hennepin County, Watershed District, City Attorney, <br /> Burlington Luce Line (DNR) and State Highway <br /> Department. <br /> A public hearing has been scheduled for October 3, <br /> 1977 at 7: 30 P.ti. <br /> (Continued) <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).