My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-29-1978 Council Minutes
Orono
>
City Council
>
1978
>
06-29-1978 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2015 10:29:36 AM
Creation date
4/22/2015 10:29:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING OF THE ORONO COUNCIL, JUNE 29, 1978 Page 5 <br /> Note that this has been before the Park Commission CONDITIONAL USE PERMIT_ <br /> and that Commission on April 4 , 1978, recor.unended Morris T. Baker Park <br /> �pproval of the trail as being in the interests (Continued) <br /> of the Park Commission. The Planning Commission <br /> was interested in having all Members completely <br /> review the facts and they did have one question <br /> of the Park Reserve District - that being as to <br /> how much of the marsh would be filled by this <br /> proposal. <br /> Planning Commission P4eeting - May 8, 1978 . <br /> Tim PZarr and Alex Mayer were present. They stated <br /> that approximately 1. 5 acres or 0. 30 of total marsh <br /> area would be filled. The trail would be constructed <br /> to within 50-75 feet of road right-of-way leaving <br /> wetlands between road and trail. Jim Olson, City <br /> Engineer, stated that drainage is probably of only <br /> slight concern and that culverts would be used. <br /> Applicants stated that they had approval of Watershed <br /> District, prelir.iinary approval of DNR hinging on <br /> culvert sizing, and preliminary approval but no <br /> permit yet from the Corps. Applicants proposed <br /> use of construction fabric as a fill base to <br /> minimize uneven settling or mixing of fill materials. <br /> Upon Planning Commission questioning of what could <br /> '�e done to minimize deteriment to the marsh, Jim <br /> Jlson suggested: 1) move trail toward the road, or <br /> 2) reduce width. Cor.�mission members discussed <br /> reducing width, leaving out trees and fencing for <br /> the 1, 200 foot length across the marsh. Commission <br /> felt that unnecessary aesthetic value should not <br /> be created to detriment of the marsh. Jim Olson <br /> wanted to see soil borings and cross-section of <br /> the trial. <br /> Motion by Hannah to table this item pending input <br /> from the City Engineer with particular attention <br /> to the trail through marsh the intent being to <br /> reduce trail width or move it closer to the road. <br /> Jim Olson will work in conjunction with applicants. <br /> Motion seconded by Frahm and unanimously approved. <br /> Planning Commission required notification of <br /> time and place of site inspection so members <br /> could attend if possible. <br /> Planning Commission Meeting - May 22, 1978 <br /> Tabled at the request of applicant to provide <br /> sufficient time to meet with Planning Comr.tission <br /> on the site. � <br /> (Continued) <br />
The URL can be used to link to this page
Your browser does not support the video tag.