Laserfiche WebLink
Y • <br /> Page 43 <br /> Summary of Ultimate Design Capacity Assigned <br /> to the City of Orono: <br /> Residential , <br /> Commercial and Sewered Sewered <br /> Zndustrial Aver- Residential Residential <br /> �e Daily Flow Population Dwelling Units <br /> Orono pumping .97 MGD 7 , 699 2, 406 units <br /> station <br /> Long Lake pumping .11 MGD 165 52 units <br /> station <br /> Orono Municipal .06 MGD 522 163 units <br /> pumping stations <br /> TOTAL 1 .14 MGD 8 , 386 2 , 621 units <br /> H. To allocate the total available sanitary sewer <br /> capacity assigned to the City of Orono only to those areas j <br /> which are within the revised MUSA, MSSR and Interceptor Sewer � <br /> Service Area lines as shown on Exhibit A. � <br /> � <br /> I . That the ultimate capacity of the Orono Long-Lake � <br /> Interceptor is 1 . 77 MGD. The portion of the total assigned <br /> to �the City of Orono is 1 .14 MGD. Future planning will be <br /> based on the Znterceptor Sewer Service Area line to be shown <br /> on Exhibit A and upon a flow of 115 gallons per capita per day <br /> and 3 . 2 people per household . � <br /> 2. The City of Orono understands from Mr . John Boland ' s <br /> letter of March 31 , 1978 , that all of the above criteria are <br /> acceptable to him and the staff of the Metropolitan Council <br /> with the exception that the staff of the Metropolitan Council <br /> recommends that there is no procedure available to move the <br /> MSSR line , the MUSA line and the Interceptor Sewer Area line <br /> until all of the Comprehensive Land Use Plans of the adjacent <br /> municipalities are submitted and reviewed by 1980 , pursuant <br /> to the Land Use Planning Act. The staff has also stated that <br /> it is premature to approve the Comprehensive Sewer Plan sub- <br /> mitted by the City of Orono in October, 1976 , as amended in <br /> �pri�, i�7�, and vn �arZti i� , i�78 , and that in lieu o� <br /> approval of the Comprehensive Sewer Plan, the staff will <br /> recommend approval of a Interim Comprehensive Sewer Plan to <br /> be submitted by the City of Orono based upon the criteria set <br /> forth herein. <br /> 3 . The City of Orono could appeal the Systems Statement <br /> of June 23 , 1977 , as amended on March 31 , 1978 , and could <br /> -6- <br />