My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-13-1978 Council Minutes
Orono
>
City Council
>
Minutes
>
1970-1979
>
1978
>
04-13-1978 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2015 4:00:12 PM
Creation date
4/21/2015 4:00:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Show annotations
View images
View plain text
REGJLAR MEETING OF THE ORONO COUNCIL, APRIL 13, 1978 Page 6 <br /> P7ayor Van Nest: Ilaybe the property should be . DAYTON PARK PROPERTY <br /> controlled by the Hennepin County Park Reserve (Continued) <br /> District. We do not have adequate police pocaers <br /> and park personnel, r�7r. Cliff French, of the Park <br /> Reserve ,should be contacted. � <br /> rsayor Van Nest moved, Butler seconded, to refer <br /> to staff for review the Dayton property matter. <br /> PZotion, Ayes (4) - Nays (0) . <br /> r4r. Lee Tomlinson, Park Commission Chairman, ORONO ORCHARD ROAD <br /> reviewed the Park Commission minutes of April 4 , BRIDGE <br /> 1978, which state: <br /> P�4r. Otto Christensen, trail planner for the <br /> Minnesota Department of Natural Resources, <br /> presented his department' s plans for a renlace- <br /> ment bridge at the crossing of the Luce Line <br /> Trail and Orono Orchard Road. The proPosed <br /> structure would be a clear span arched bridge , <br /> 10 ft. pathway of steel construction with wood <br /> rails and trim. Primary reasons for considering <br /> a new bridge were: <br /> l. Inability of current bridge to accommodate <br /> road and drainage improvements without dis- <br /> rnantling. <br /> 2. Increasing cost of new bridge in future years <br /> if installation is delayed. <br /> 3. Difficulty experienced by trail users who <br /> • must cross at road grade elevation. <br /> A motion by Tomlinson, seconded by Kelley, to <br /> recor.unend to the City Council_ that DNR plans for <br /> a new bridge be favorably considered was <br /> unanimously passed. <br /> Council r�eeting - April 13, 1978 <br /> P�ayor Van PZest: Is the new bridge necessary? <br /> Jir.t Olson, City Engineer: Staff has reviewed and <br /> does recommend that the bridge be replaced. Problems <br /> are: drainage, narrowness, bad piling, and bac� <br /> culverts. <br /> P4ayor Van Nest: The bridge should be the Department <br /> of Natural Resources' responsibility, not Orono. <br /> Paurus r.loved, Butler seconded, to redeck and retain <br /> the old bridge conditioned on the bridge beinc� saf_e <br /> and will continue to be maintained by the Depart- <br /> r.lent of Natural Resources. D4otion, Ayes (4) - Nays (0) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).