Laserfiche WebLink
.. <br /> Page 27 <br /> . <br /> ' ��.�.�, R�, ���� � �4��;�, ��. e�.�� �.�� <br /> .2335 �k/. `1�.+�i �/I��ituas� 36 Orro G. Bonet�roo, P.E. Laxrencc F. Fddsien, P.E. <br /> �� nQ� ��/fitP64iQ� 55„3 Ra6c�t iV. Rosene, P.E. Glenn R. Cook. P.E. <br /> loseph C. Anderlik, P.E. Kclth A. Go.don, P.£. <br /> / B�adford A. Lem berg, P.E. Thomat E. Nayts, P.E. <br /> nifOKC: 636-�600 Robn�D. Frigaard, P.E. Rfchard 1V. Fos�n, P.E. <br /> Richard E. 7urno, P.E. Robe��G. Schuntch4 P.E. <br /> James C. Olson, P.£. bfarvin L. Sorvola, P.E. <br /> Donald C. Burga�dl, P.E. <br /> A ri1 l� 19.IH Xenne7h R. Meialci, P.E. <br /> P � Charles A. ErickJon <br /> Leo M. Paw�rlsky <br /> Xa�lan M. Olson <br /> Ptr. P.obert Mazanec <br /> Senior Planner • <br /> Metropolitan Council <br /> 300 Pietro Square Building <br /> St. Paul, riinnesota 55101 <br /> Re : Orono-Long Lake Interceptor <br /> Our File No. 139 <br /> Dear Mr. Mazanec : <br /> The letter dated March 31, 1978, from John Boland to Mayor VanNest <br /> fairly represents the items discussed and the understandings reached <br /> between the riayor of Orono, the rnace Staff and the Council Staff at <br /> the meetings of March 27 and March 30 at the Metropolitan Council <br /> offices. <br /> The City of Orono's support of the Orono-Long Lake facility, prior to <br /> actually relocating the I�NSA line and the MSSR line is a policy ques- <br /> tion to be resolved by the Orono City Council. The Orono Council will <br /> be considering this matter in the very near future. <br /> Our firm has been directed by the City of Orono to prepare an interim <br /> CSP, to the year 1980, as discussed at the March 30 meeting. We under- <br /> stand that your office will be forwarding a set of guidelines to use <br /> ' _ in the preparation of the ir.terim CSP. In order to assist in the <br /> , preparation of the interim CSP and to aid the City Council in the eval- <br /> uation of the policy decision to support the Orono-Long Lake Interceptor, <br /> we have been requested to seek clarification of several specific items, <br /> as follows : <br /> 1) What is the correct amount of the ultimate capacity of the <br /> Oron�-Long Lake Interceptor? <br /> The revised System Statement, Page 19, lists the <br /> ultimate average daily flow at 1.71 i�IGD. Addend�n No. 3, <br /> revised Table 10 of the Preliminary Engineering Report in- <br /> dicates 1.77 MGD. <br /> 2) What is the correct amount of the Ultimate design flow <br /> from Orono� <br /> The revised System Statement, Page 19, lists the <br /> amount at 1.09 MGD. Addendum No. 3, revised Table 10, <br /> indicates 1 .14 MGD. <br /> Page 1. <br /> . <br />