My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-16-1978 Council Minutes
Orono
>
City Council
>
1978
>
03-16-1978 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2015 3:43:08 PM
Creation date
4/21/2015 3:42:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� RrGULAR IIEETI?�G OF `i'HE ORONO COUPdCIL, P1yRCH 16 , 1978 Page 2g <br /> The letter from �he DNR suggested a preference of DIVISION <br /> �ccess and utilities be located along the north 2600 Casco Point Road <br /> ines rather than in the unimproved public right-of- (Continued) <br /> way along the south lot line. • <br /> The letter from the City Engineer suggested the <br /> applicant submit the following: <br /> 1. Certified survey of property specifically <br /> locating Casco Point Road right-of-way as <br /> traveled. <br /> 2. Indicate access driveway and utility easement <br /> for Lot B on proposed plat (along north lot <br /> line of A) . <br /> 3. Driveway plans (existing and proposed elevations - <br /> fill required and driveway cross section) . <br /> 4 . Sanitary sewer detail - (elevation of existing <br /> riunicipal sewer line and proposed individual <br /> - connections and grades of sewer lines for each � <br /> lot) . <br /> 5. Indicate surface drainage easements on property <br /> including culverts if necessary under proposed <br /> driveway. Drainage easement to be approved by <br /> City Engineer. <br /> 6. Submit an erosion control plan prior to <br /> construction on either lot. Erosion could be <br /> controlled with mulch, tertporary straw bale, <br /> dikes or other techniques to prevent sediment <br /> runoff, (erosion control method to be approved <br /> by City Engineer) . <br /> The Zoning Administrator suggested the applicant <br /> prepare revised nreliminary plans and submit them <br /> for review by Planning Commission at next meeting. <br /> Also suggested the following conditions be resolved <br /> prior to submitting final plat for approval so <br /> resolution of approval could be final without any <br /> unresolved conditions: <br /> l. Park dedication fee of $2, 000 ($1, 000 per lot) . <br /> 2. Current title opinion addressed to the City <br /> approved by City Attorney. <br /> 3. Payment of additional assessments : <br /> a. One water unit of $580 <br /> b. Two sewer units (one for each residence <br /> to be paid when respective building permits <br /> are issued) . <br /> Planning Commission after reviewing proposal tabled <br /> the issue until revised plans are subrlitted for <br /> consideration. <br /> Planning Commission - February 27, 1978 <br /> Paul I:aster was present. The Zoning Administrator <br /> presented the revised plans which included the data <br /> as requested by the City Engineer, Jim Olson, who was <br /> also in attendance. (Continued) <br />
The URL can be used to link to this page
Your browser does not support the video tag.