My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-23-1978 Council Minutes
Orono
>
City Council
>
1978
>
02-23-1978 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2015 3:34:54 PM
Creation date
4/21/2015 3:34:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�, 'Tclrpl�onc <�3735 . <br /> Page 57 <br /> - � �� � - � ��'�`�' �� �I� �Y <br /> . - _�_ . . � � <br /> _ -� . <br /> � _'� ► ��:�;�"- Post Off,c� Box G6•Crystal Bay,1�'Jinnc�ota 55323•1�7unicipal O�ca <br /> ; • :� --.. <br /> -;.� '�,�.��1��; _ . <br /> =�' � ::�� OR ihe 1Vorth Shore of Lake 1►Sinnetonka <br /> " ;�� " . <br /> '����� . <br /> -��,-�.��_ <br /> February 6, 1978 <br /> Represenfative Robert L. Searles <br /> 575 North Ferndale Road <br /> Tr'ayzata, 1�innesota 55391 • <br /> Subject: Orono-Long Lake Znterceptor - <br /> Dear Bob_ <br /> I attended a r_ieeting �'hursday r.�orning at the i�ietropolitan Z•7aste <br /> Control Comr.iission t�ith Bernie I�arrington to discuss our concerns <br /> about the Orono-Long La}:e interceptor as it relates to t�e MUSA <br /> line and the City's Cor�prehensive Land IIse Planning_ Rarl Burandt, <br /> - of the I4etropolitan Council staff, was also present and informed <br /> us that he ti�as drafting a staff review of the Orono-Long Lake <br /> interceptor to be presented to �he- Physical Development Com�ittee <br /> in the near future. ' <br /> Dur�ng the course of the r�eetir�g, it became clear that the interceptor <br /> pipe itself had sone aaditional- hydraulic capicity th at would allow <br /> �or future expansion of �.he sewei service area within fi�e �ity of <br /> ' Orono. The pump stations that are presently designed for the <br /> interceptor- will only handle the flows projected by the City fron <br /> that part of our City whiclz is presently sewered and whieh we intend <br /> to include in the urbran service area, bu� the pipe itself could <br /> - handle additional �lows if larger punps were installed at a later <br /> clate. As you know, on June 13 of 1977, Sandy Dean of the Metropolitan <br /> � Council staff recomroended to th� Physical Development Comrnittee that <br /> the MUSA line within Orono be moved in accoraance wit� our Comprehensiv <br /> Planning but that recorunenaation has been withdrawn because of the <br /> objections of Pir_ Dougherty of the j�7aste Control Commission in that <br /> t1�e MUSA line must be consistent with- the NSetropolitan se�aer service <br /> area. <br /> The City's position has always been that the Orono-Long I.ake intercepto <br /> was brought in to Orono �or purposes of removing the effluent from <br /> = - the Orono and Long Lake sewer plants and not to provide a catal�st <br /> forcing urbanization of -rural Orono to a level beyond which I�ake <br /> liinnetonka could tolerate fron the standpoint of higher phosphorus <br /> content of the storm water runoff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.