Laserfiche WebLink
•. <br /> : <br /> � O� <br /> O :. O <br /> ������,�=� CITY of ORONO <br /> �.-� � <br /> � ����`r:A���� ti ��� <br /> '� �'(�1��� ay�"�,�'�r G~ Crysmt Bay,Mion�o�55323-0066 <br /> �9x�r�o:g,�i <br /> S <br /> June 10, 1992 <br /> Shannon McGurran <br /> Office of Planning & Development <br /> Development Planning Unit <br /> 822 South 3rd Street, Suite #310 <br /> Minneapolis, MN 55415 <br /> RE: Robyn Stewart, 370 Leaf Street <br /> Dear Shannon: <br /> I have received your memo dated June 4, 1992 inquiring whether <br /> repairs to the existing septic system will be required with the <br /> hookup to sanitary sewer system potentially available by November <br /> 1992. <br /> As of June 8, 1992 the Orono City Council awarded bids for <br /> a sanitary sewer system for the Stubbs Bay area which includes <br /> Robyn Stewart's home at 370 Leaf Street. Since the anticipated <br /> completion of the sewer trunk line is expected by late 1992 and <br /> the existing septic system is not discharging to the surface at <br /> this time, the City has decided that the installation of a <br /> temporary septic system will not be required if the following two <br /> conditions are met: <br /> l. Septic tanks must be pumped out as often as necessary <br /> to prevent surface discharge from the existing <br /> drainfield. During a site inspection approximately <br /> three weeks ago, the system was inspected and was not <br /> surfacing at that time. Ms. Stewart should anticipate <br /> between three and six septic pumpouts between now and <br /> 1993 in case the system discharges to the surface. <br /> 2. A permit for the connection to City sewer must be <br /> issued within 30 days of availability contingent upon <br /> favorable conditions. Due to the non-conforming nature <br /> of this septic system and its high potential for <br /> discharge to the surface, hookup to the City sewer will <br /> be required within 30 days. <br /> TELEPHONE-473-7357�FAX-473-0510 <br />