My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
re: septic problems
Orono
>
Property Files
>
Street Address
>
L
>
Leaf Street
>
370 Leaf Street - 04-117-23-23-0032
>
Correspondence
>
re: septic problems
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:10:35 PM
Creation date
5/1/2017 1:32:59 PM
Metadata
Fields
Template:
x Address Old
House Number
370
Street Name
Leaf
Street Type
Street
Address
370 Leaf St
Document Type
Correspondence
PIN
0411723230032
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- O ` <br /> �' .1� . <br /> O O , - . <br /> ,a r:�,._ C ITY of ORONO <br /> ,� � , � ._ � . <br /> M►,N�;�,ot��� <br /> ������� �� �1?� ���� �� �,�,�' Post Of6ce Box 66 <br /> ,�� , �,, � ,=�G ,, cry��y,;K;���ss�zs-oo� <br /> \\kESH�g'" <br /> �_� ,. <br /> July 29, 1991 <br /> Jim Graham <br /> Office of Planning & Development <br /> 822 South 3rd Street <br /> Suite #310 <br /> Minneapolis, MN 55415 <br /> RE: Robyn Stewart, 370 Leaf Street <br /> Dear Mr. Graham: <br /> Thank you for your prompt attention regarding the Stewart situation. <br /> I appreciate the chance to respond to the issues which you raised. <br /> We would expect the installed cost of a 1500 gallon storage tank to be <br /> in the range of $1200-$1500, with a minimal drainfield adding perhaps <br /> $500-$1000. With the minimal drainfield, tank pump-outs would likely <br /> only be needed once or twice a year at a typical cost of $100 per <br /> pump-out. Without the drainfield, pump-out costs could easily exceed <br /> $2500 per year depending on the actual household waste load. <br /> Once a decision on the sewer is reached, if the project goes ahead, <br /> a 1 1 residents served with sewer wi 11 be required to connect to it <br /> within 16 months of the time it is available, and abandon their septic <br /> systems even if they are operating effectively. This is a <br /> City ordinance. <br /> If the sewer project does not proceed, at such time that Ms. Stewart's <br /> septic system is found to be failing, the permanent solution would <br /> involve the following: <br /> A. Soil testing and system design work wi11 be needed before a <br /> repair permit could be issued. Estimated cost: $500.00. <br /> B. Based on our preliminary investigation, this site would <br /> require a sewage treatment mouncl system due to high seasonal <br /> water tables. Using the 1500 gallon storage tank as a <br /> septic tank, Orono Code would require an additional septic <br /> tank and a pump tank, with dosing pump and high water alarm. <br /> These tanks and the mound system to serve this 3-4 bedroom <br /> home would cost the range of $7500 , in addition to the <br /> initial storage tank and soil testing costs. <br /> 'TEI.EPHONE-473-7357� FAX-473-0510 <br />
The URL can be used to link to this page
Your browser does not support the video tag.