Laserfiche WebLink
• <br /> � R�GULAR i7E�TIr1G OF TH� OROPJO COiJP1CIL, DECEPIB�R 12, 1977 Page 8 <br /> � Staff - Novenber 29 , 1977 SUBDIVISION <br /> 1550 Sixth Avenue NortY <br /> � Council has referred this proposal back to the (Continued) <br /> Planning Commission for reconsideration. The <br /> � City �ngineer report indicates some possible <br /> • problems. � <br /> � I contacted Gordy Coffin for several additional <br /> copies of the proposed subdivision so I can forward <br /> � a copy to the Hennepin County Soil & Water <br /> Conservation District for a soil map and report. <br /> � I ar�1 including this iten on the agenda as an <br /> i action item if reports are received in time for <br /> �lanning Commission review and recor:unendation, <br /> � Council P4eeting - December 12 , 1977 <br /> � <br /> P4r. James Lawrence, b4r. George Boyer, Hickok <br /> � & Associates, and PZr. Doug Carney, re}�resenting <br /> i t�r. Lawrence, were present to discuss the proposed <br /> subdivision and to review Exhibits #l, Soils P�ap; <br /> and Exhibit #2, HicYok & Associates review of the <br /> proposal. <br /> r��r. Alan Olson discussed his memo of December q , <br /> 1977, which states: <br /> y Receipt of owner' s engineering report and soils <br /> . report from Hennepin Soil and Water Conservation <br /> District. <br /> � Very brief review of above information: <br /> � <br /> Lot 1 - boring and perc' s uphill of house on <br /> � 12% slope - possible sidehill seepage <br /> concern. Fiouse located on 24� slope - <br /> � riajor erosion concern <br /> • no driveway indicated <br /> flat . area of lot is Glencoe loam <br /> critical lot factors indicate close <br /> review of this site <br /> � <br /> Lot 2 - boring and perc's on 6 - 10 o slope very <br /> � near to Glencoe loam indentification <br /> � Lot 3 - boring and perc' s on 20o slope leading to <br /> . creek and drainage easement - i*►easures <br /> 60 feet between house and easement; all <br /> � sloping <br /> water table above 7' indicates mound design <br /> � perc rate unacceptable 120 mpi. (mound does <br /> not alter perc rate) <br /> � <br /> (Continued) <br /> � <br /> � <br />