Laserfiche WebLink
t ' <br /> k . < <br /> CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> GENERAL INFORMATION . <br /> 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be <br /> reviewed and a permit will be issued within 2 working days. <br /> 2. Permit cazds will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL <br /> YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON <br /> THE JOB SITE. <br /> 3. Mechanical Desi�ns - Complete calculations, details and specifications are required for each heating, <br /> ventilation, humidification-dehumidification, and air conditioning installation including heat loss/heat gain <br /> calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. <br /> Data shall be presented on form provided. Identification of and specifications for water heating equipment <br /> shall also be provided. <br /> 4. When any new construction or remodeling is involved, a separate building permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements. <br /> 6. All work must be inspected(rough-in and final). Call 249-4600. 24-hour notice required. <br /> 7. House Heating Test Record must be submitted before final. <br /> Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 249-4600. <br /> Please check one: �New Addition Repair Replace <br /> � Residential Commercial � <br /> JOB SITE: 3 ys ��u FF S �- Zip: <br /> Owner's Name: Telephone Number: <br /> Mailing Address: City: Zip: <br /> Contractor's Name:X�/a,,,,, S -yl��c C,. z�� Telephone Number: ��Z -y 2 i---z Y i p <br /> MailingAddress: is�rY� �;1�-P�,d s�- ,�/,,� City: ,�„ ,✓o,,�„- Zip: SS3�.� <br /> SYSTEM DESCRIPTION _ <br /> HE:�TING SYSTEMS <br /> Quantity: 1 <br /> Make: L c�� �� u,� <br /> Model: G-�G c� 3/�- i�.., <br /> Fuel: Nu�- ��.S <br /> � Flue Size: 3°����-� <br /> Input BTUs: /p�'i w� <br /> Output BTUs: q Zo�� <br /> CFM: <br /> COOLING SYSTEMS <br /> Quantity: / <br /> Make: L.c����o x <br /> Model: ysz9-a��� <br /> Tons: 3�i�L. <br /> H. Power <br /> l . j' <br /> � _ � <br /> �. <br />