My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-12-1977 Council Minutes
Orono
>
City Council
>
Minutes
>
1970-1979
>
1977
>
09-12-1977 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2015 2:20:41 PM
Creation date
4/21/2015 2:20:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> � I�}'��U1,%�R P9�j,1-,'lING OF TIIE OROIJO COUNCIL, SEPTFPIBER 12 , 1977 Page 2 <br /> ` Preliminary plat review will require submittal of SUBDIVISION - PRD <br /> c,ngineering drawings based upon the survey indicating 3201 Navarre Lane <br /> ��t location, setbacks , wetlands area, dry land (Continued) <br /> r_ca, sewer and �aater proposals, drainage, etc. <br /> This information should be available for the public <br /> • hr_�ariiig which has been schedu]_ed for June 6 , 1977 at <br /> 8 : 00 P .M. <br /> � <br /> P1ai111iizg Cornmission Pieeting - P9ay 16 , 1977 <br /> � <br /> Sandy Ritter, owner' s architect, was pr.esent to <br /> � discuss proposal with the Planning Cornmission. <br /> ` Iie was advis�d of materi.als and information required <br /> for proper analysis of the proposal, and he i_ndicated <br /> � that it would be irlpossible to have this to the City <br /> in tirie to hold the June 6, 1977 public heari_ng which <br /> � has, therefore,b�en postponed. He did indicate <br /> tliat the lots would be sold as building sites only; <br /> that they would be sold fee simple with common <br /> association ownership of open space; roads are to <br /> � be private; wetlands and open space are to have <br /> � conservation easements deeded to the City. Separate <br /> plats will be filed for each city. <br /> ` <br /> Staff - August 10 , 1977 <br /> � <br /> R��ceived copies of preliminary plat survey. The <br /> 3sic concept of the project has not changed f_rom <br /> �e earlier subr,iittals . Note the slopes indicated <br /> � on Lots l, 2, & 3 of Block 2 . The proposal for <br /> . Orono is a PRD with five lots on 8 . 3 dry acres in <br /> a one acre zone. <br /> A <br /> Conditions should include correct water and sewer <br /> � assessments, park dedication fees, and open space <br /> easements over Outlot I3. A public hearing has been <br /> � scheduled for September 6, 1977 at 7 : 30 P.r4. <br /> , Staff - August 16, 1977 <br /> Sewer interceptor and lateral has been assessed. <br /> � Sewer units of $225 each must be collected at the <br /> time of construction of each dwelling. Water has <br /> � been assessed to the amount of eleven commercial <br /> units. <br /> � <br /> � Planning Commission P�eeting - September 6, 1977 <br /> � Public I�earing. Discussed general layout as modified <br /> by the latest plan. The proposal includes five <br /> � Orono lots, each large enough to provide adequate <br /> setbacks within the proposed lines . The street <br /> c�t.hack should be measured from the project boundary/ <br /> �tr��et Low, and not from the individual lot line. <br /> (Continued) <br />
The URL can be used to link to this page
Your browser does not support the video tag.