My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-P11492 - demo
Orono
>
Property Files
>
Street Address
>
L
>
Leaf Street
>
95 Leaf Street - (now part of Graham Hill Preserve)
>
Permits/Inspections
>
2007-P11492 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:47 AM
Creation date
4/28/2017 1:25:29 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O���O <br /> �i�,� Principal Dwelling Demolition Permit <br /> � ��''�r � ZONING DISCLOSURE & DECLARATION <br /> � �����, �� <br /> ���, � <br /> Ho� <br /> To the property owner: Demolition of the principal dwelling structure on a <br /> property may automatically terminate certain rights which may have accrued to the property by virtue of the <br /> continued existence of that building. <br /> • Rebuilding on a substandard lot of record (i.e. a lot that does not meet the zoning district required lot <br /> area or width standards) will, with few exceptions, require variance approval by the City Council, and <br /> such approval is neither automatic nor guaranteed but requires that a hardship be demonstrated. <br /> • Additionally, all current zoning standards will have to be met by the new principal dwelling including <br /> setbacks, lot coverage by structures, hardcover(impervious surface), height limits, etc. <br /> • Where municipal sewer is not available, provision of two (2) sites for a conforming on-site sewage <br /> treatment system is mandatory. <br /> � Unless specifically approved by the City, all accessory structures must be removed at the time of <br /> principal dwelling demolition.This also applies to seasonal and permanent docks,which may not be re- <br /> installed until a new principal dwelling has reached the framing stage. <br /> The following information is presented for the purposes of advising the property owner of the implications of removal <br /> of the rinci al dwelling on the ro erty: <br /> 1. Property Address: 95 Leaf Street PIN# 05-117-23-11-0005 i <br /> �. <br /> Required Lot Area 2.0 acres Required Lot Width 200' <br /> 2. Zoning District: RR-1 B Actual Lot Area 39 acres Actual Lot Width 200'++ <br /> Lot area variance is/is not equired. Lot width variance is/'s not quired. <br /> 3. Required Setbacks: Front 50' Rear 50' Side 30' Side Street 50' <br /> Lakeshore Lot: Lake(Front) Na Street(Rear) na <br /> Average Lakeshore Setback: must be met/ s not a licable. <br /> 4. Lot Coverage by Structures: limited to 15%of lot area/doe not a l lot area>2 acres <br /> 5. Hardcover limitations: are aaplicable/a not applicable 0-75'zone= 0%allowed <br /> 75-250'zone=25%allowed 250-500'zone=30%allowed 500-1000'zone=35%allowed <br /> 6. O Municipal sewer is not available; on-site system testing and design must be provided confirming that two conforming <br /> drainfield sites are available. <br /> 7. O Wetland(s)present. Wetland is classified as"_Talk To Staff ". A' buffer from the edge of wetland and a 20' <br /> structure setback from the buffer is required. *"Talk to Planning Department Staff for additional requirements. <br /> The undersigned property owner hereby acknowledges receipt of the above information. Staff Initials <br /> � <br /> � lj �� 1� �� � � o� G�W� <br /> Property Owner's Signature Date <br /> Form ZDD—Revised 5-23-OS (Original: Street File; Copy: Property Owner) <br />
The URL can be used to link to this page
Your browser does not support the video tag.