My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-P10560 - demo
Orono
>
Property Files
>
Street Address
>
L
>
Leaf Street
>
95 Leaf Street - (now part of Graham Hill Preserve)
>
Permits/Inspections
>
2006-P10560 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 7:19:47 AM
Creation date
4/28/2017 1:25:08 PM
Metadata
Fields
ProcessedPID
True
Tags
No PIN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> l <br /> CITY OF ORONO APPLICATION FOR DEMOLITION PERMIT <br /> P.O. Box 66 (2750 Kelley Parkway) <br /> Crystal Bay,MN 55323 <br /> SPECIAL CONDITIONS &HOLD HARMLESS AGREEMENT <br /> General Instructions <br /> 1. You may be required to obtaiu other permits, i.e. well abandonment, etc. <br /> 2. Work must not begin unless the permit card is available oii the job site. <br /> 3. A 24 hour notice is required for all inspections. Call(952) 249-4600. <br /> JOB SITE ADDRESS: � -S �-e'� � S �- <br /> Occupancy Type: � Resideiitial Commercial <br /> OWNER'SNAME: Ed ►'h u n�l Gra ��m Phone: � I 2- � 6�.-��`�O <br /> Mailing Address: �9 0 9 R �u ce ��e City: �d��4 <br /> CDI�TRAC'TOR'S NAIVIE: 6 �✓ h e r' Bus.No.: <br /> Mailing Address: City: <br /> Demolition if planned by means of: � manual disassembly <br /> heavy equipment <br /> Pemiits Issued: <br /> # Well Abandonment <br /> In return for issuance of said Demolition Peimit,the undersigned owner hereby agrees as follows: <br /> 1. The struciure(s) shall be kept enclosed aiid/or sectued until such time as demolition is <br /> complete. <br /> 2. Demolition debris�vill be kept off adjoiizing property and/or the public rights-of-way unless <br /> specific prior approval is obtained in writing for temporary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in accordance with all <br /> applicable PCA requirements. <br /> 5. Water wells must be abandoned in accordance witli State Health Department regulations. <br /> 6. Se�ver and water nrust be discomiected at the services at the street by qualified contractors. <br /> 7. Inspection required when all debris has been removed,before backfillin�. <br />
The URL can be used to link to this page
Your browser does not support the video tag.