My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-27-1977 Council Minutes
Orono
>
City Council
>
Minutes
>
1970-1979
>
1977
>
06-27-1977 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2015 1:31:20 PM
Creation date
4/21/2015 1:31:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETIPIG OF 1^HE ORONO COUNCIL, JUNE 27 , 1977 Page 16 <br /> 4 . Building permit minimum fee has been $5. 00 REVISED FEE SCHEDULE <br /> in 1973 U.B.C. The current U.B.C, is $10 . 00 . (Continued) <br /> � I have always charged $5. 00. <br /> 5. I do not agree with only a $25 . 00 plan review <br /> charge. Currently, we charge 1/2 the building <br /> permit fee. I think we should continue. It is <br /> a necessary service and more will be required <br /> as the State Legislature continues revising <br /> regulatory measures for construction. This <br /> service would be much more costly if the <br /> applicant were required to provide certification <br /> of compliance by certified engineers. The <br /> great majority of the 188 municipalities in <br /> the Metro area have adopted the 50� U.B.C. <br /> recommendation. <br />� 6 . We should charge a little more on septic system <br /> reviews. Probably $60. 00, as our cost to <br /> I our engineer is usually about $50. 00 when we , <br /> f refer the designs for his review. <br /> 7. We should probably charge more on moving houses <br /> in. Most houses being moved are not in the <br /> best of condition. It takes quite a bit of <br /> staff time to inspect these older structures. <br /> This would probably help control moving into <br /> Orono of some marginal buildings. <br /> 8. Mechanical permits - $10. 00 minimum. Consider <br /> sliding scale based on horse poc�er and BTU' s. <br /> Council Meeting - June 27, 1977 <br /> ! Mayor Van Nest moved, Paurus seconded, to instruct <br /> staff to make revisions to the proposed fee schedules <br /> � for Council review at the July 11, 1977 Council <br /> Meeting. Motion, Ayes (4) - Nays (0) . <br /> Mr. Glenn Hawkyard, West Hennepin Assessing District WETLANDS ASSESSMEPITS <br /> Assessor, discussed with the City Council wetlands <br /> and their value for assessment purposes stating <br /> that there is a general breakdown between land and <br /> S buildings and all wet areas ,with no buildahle <br /> lots ,are usually valued at $100 per acre and open <br /> space and density credits are considered and that <br /> all wetlands are valued at what the market will bear. <br /> Paurus moved, Mayor Van Nest seconded, to re�uest <br /> the City attorney and Mr. Hawkyard to draft a <br /> resolution for Council review delineating marshlands <br /> and determining their value breaking out structures <br /> and dry buildable lots within the wetlands. Idotion, <br /> Ayes (4) - Nays (0) . <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.