My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-13-1977 Council Minutes
Orono
>
City Council
>
1977
>
06-13-1977 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2015 1:22:38 PM
Creation date
4/21/2015 1:22:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
! - <br /> Ri�GULAR MEETIPIG OF THE ORONO COUNCIL, JUNE 13 , 1977 Page 55 <br /> � <br /> + Dick Benson, City Administrator, informed the City ADMINISTRATION OFFICE <br /> Council that on June 9 , 1977, Lyle Swanson from wELL <br /> �McCorlbs-Knutson Engineering and myself received <br /> informal quotes for a new well for the Administration <br /> r Office at 1335 Brown Road South. <br /> r Quotes were for a six-inch and four-inch well with <br /> � a separate price for plumbing from the well to the <br /> office building, a distance of 220 ' . <br /> • <br /> Of the three quotes received, Stevens Well was low <br /> � at $4, 989 . 00 for a four-inch well and $2 , 375. 00 for <br /> the plumbing for a total of $7, 364. 00. The highest <br /> � quote was from Bergerson-Caswell for $6 , 619 . 70 for <br /> i a four-inch well and $1, 633. 75 for the plumbing. <br /> We did contact Bergerson-Caswell to see if they <br /> � wanted to do the plumbing only. They stated <br /> they would not do the plumbing unless they could <br /> r install the well. <br /> S I did contact Dolder Plumbing in Navarre and received <br /> a quote from him for the plumbing for $1 , 725. 00. <br /> � I have talked to Tom Stevens from Stevens �4e11 and <br /> • he would not object to someone else doing the <br /> plumbing, in fact, would prefer that it be done <br /> � that way. <br /> � There are some unknown factors to be considered <br /> on the project and could alter the total cost of <br /> � the project. <br /> � l. The price for the well was quoted at 190 ' deep. <br /> ` If they should have to go deeper it would be <br /> $7. 00 per foot additional for the four-inch well. <br /> � <br /> 2 . As noted on the bid tabulation for Stevens �Jell, <br /> � if Northern States Power Company can furnish <br /> underground service to the well the price will <br /> � be $100. 00 less. <br /> � 3. If Dolder Plumbing makes the connection from <br /> � the well to the Administration buil�ing, we <br /> will use the City equipment to dig the trench, <br /> � unless a trenching machine is available. If <br /> the trencher is available, I would certainly <br /> S recor,unend it because of a quicker and cleaner <br /> • job. This should not make a great deal of <br /> difference in the plumbing costs as it may <br /> � lower the labor portion of this quote. <br /> � 4 . When I asked Dolder plumbing for a quote, I <br /> asked him to include a freezeless yard hydrant <br /> � and to be installed at the location of the well. <br /> � ihis will allow us to water the lawn and trees <br /> and will also allow us to use the water supply <br /> a for steam cleaning equipment in the area of the <br /> long gold equipment shed. This cost is included <br /> � in his c?uote (approximately $50. 00) . (ContiT:,�ed) <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.