Laserfiche WebLink
� <br /> . REGULAR� MEETING OF THE ORONO �OUNCIL, MAY 23, 1977 Page 7 <br /> � Welsh moved, Butler seconded, to adopt Resolution RESOLUTION #784 <br /> #784, A Resolution Approving The Registered Lan� RLS - Bruce Kobs <br /> �urvey # , for Bruce Kobs , 2732 Caroline 2732 Caroline Avenue <br /> venue. Motion, Ayes (4) - Nays (0) . (Continued) <br /> • <br /> � Henry Muhich, Building & Zoning Administrator, RIPRAP & SEAWALL <br /> � read into the record the following memo Walter' s Port Lagoon <br /> concerning Walter' s Port Improvement & Maintenance #245 <br /> � Association, Walter' s Port Lagoon, dated May 9 , <br /> 1977: <br /> � <br /> Council Meeting - May 9, 1977 <br /> � <br /> • Approved dredging of lagoon and channel with <br /> instructions to provide protection against <br /> S spoils seeping into lake proper through the <br /> mouth of channel. Also approved metal seawall <br /> � for east shoreline of channel and lagoon and riprap <br /> of north shoreline of lagoon. Deferred action on <br /> � shoreline protection as proposed for west wall <br /> • because several members of association did not <br /> agree with proposal as submitted. Council also <br /> � concerned with proposed west wall protection <br /> because of necessity for use of City right of <br /> � ways for anchoring seawall. Conflicts with <br /> City regulations for use of public lands for <br /> �rivate improvements and benefit. <br /> � T�e City Council directed the City Engineer <br /> • continue reviewing proposal and report back with <br /> most logical solution. <br /> � Letter from Greg Frank, City Engineer, dated <br /> � May 16 , 1977: <br /> � On April 12, 1977, I met with Pdr. & Mrs. Arthur <br /> � S. Ellis, Mr. Dick DeGregery, and Mr. H.R. Hartman <br /> to discuss the subject dredging and riprap/seawall <br /> • application for the west side of the lagoon. <br /> � During the discussion, three basic proposals were <br /> offered for the improvement and maintenance of <br /> � the west lagoon wall. They were as follows: <br /> � A. Construct an aluminum seawall: On April 18, <br /> • 1977, we discussed our concerns relative to <br /> this proposal. Mr. Hartman has since had pH <br /> � and electrical resistivity measurements taken <br /> and presented me the results. Based on these <br /> � tests, the seawall should not experience <br /> corrosion. However, we still have concerns <br /> � regarding the structural stability of the design <br /> � and would recommend that (1) soil borings be <br /> taken to determine earth pressures, and (2) detailed <br /> • structural design information be submitted to verify <br /> the adequacy of sheeting length and anchors. (Continued) <br /> � <br /> � <br />