My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-09-1977 Council Minutes
Orono
>
City Council
>
1977
>
05-09-1977 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2015 3:49:48 PM
Creation date
4/20/2015 3:49:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> � � Page 31 <br /> • . <br /> � produc�ion. I did not �now this at �he time I w�s writir�g the <br /> � specifications and was using their specification sheet as a � <br /> re1'erence at the time. I�ir. Nyquist has stopped in and talked <br /> � to me several times in the past year; during our conversations, <br /> � we had talked about a three-yard machine with an Arnerican or <br /> Balderson quick coupler, plow and wing. Mr. Nyquist regretted � <br /> � tbe fact that he did not inSorm me that their two-yard machine <br /> was no longer in production. They welcome the total cost bid <br /> � pr•ocedure. <br /> � 2. 2�innesota Trac�or has �he Fiat Allis loader. According <br /> � to N'1r. Ja.mes Nelson, Sales Representative, tneir rachine met our <br /> specific�.t�ons but they do not like �he f ive-year guaranteed main- <br /> � tenance part of tne contract. I a�ked him to send me a letter to <br /> �bat efi'ect. Approximately ten minutes later, 2�r. Frank Ascner, <br /> • Sales i�anager �'or 2�innesota Tractor, called me and asked �hy I <br /> wanted a le�ter from him giving the rezsons for not bidding. I <br /> � e�plained to him t�.at I wanted to assure myself and the Oron o City <br /> � Council that I did not write specifications S'or one raacisine. I�tr. <br /> Ascher inS'ormed me tizat the reason they did not bid is because <br /> ` they did not like the total cost purchzse part of �he contract, <br /> but �neir machine did meet our speci fications and that if a le��cer <br /> � 1'r•om h�m would help another co�pany sell �heir ruachine he would <br /> decline sending a letter. I asked him if their company ever bids <br /> � a �uachine wi th the total cost part of a contract and he told me <br /> • �hat they do but do not like it. <br /> � 3. Road Nachinery and Supply Company has the NLichi�an <br /> Clarke loader. According to 2�ir. Bill Johnson, Sales Represen- <br /> � tative, their rnachine met our specifications and they have no <br /> problem with a five-year maintenance guarantee; however, they <br /> 0 do not like to guarantee a plow and wing for fiye years. lney <br /> . do par�icipate in �otal cost biddir� on �heir mzcnines. <br /> � l�. Zeco Company has the Massey Ferguson loader. According <br /> to Mr. Gar� McNevin, Sales Representative, he �'elt he did not � <br /> � have enough time to come up with the combination of loader, quick <br /> coupler, plow and wir�g called for in �L;r speci#'ications a�d deliver <br /> � sa�ne by �he delivery date called for in t�e contract. He did feel <br /> . his machine met our specific��ions, but the specifications ca.me at <br /> a time when he was very busy; however, he did compliment the City <br /> + f'or writing a very tight specification in which the interest oP <br /> the City of Orono was first and foremost. - <br /> � <br /> 5. Case Power and Lquipment l�as �he Czse loader. N`.�.�. Ro�er <br /> • Jones, Sales Manager, informed me ��-�at accorning to our specificz- <br /> tions, we called for the cab to be mounted to the rear of the <br /> � point of articulation. I went over our specifications again, and <br /> � found we did not specii'y whether �he cab was to be moun�ed �o the <br /> front or rear of articulation. This was apparently a misjudgervent <br /> � by I�Ir. Jones. Had he read �he specifications more �horoughly, <br /> their machine would have met our specifications. I�`lr. Jones stated <br /> � that tney do bid total cost and can supply a quick coupler, plow <br /> and wir.,g. <br /> � � <br /> (Continued) <br /> 0 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.