My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-11-1977 Council Minutes
Orono
>
City Council
>
Minutes
>
1970-1979
>
1977
>
04-11-1977 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2015 3:34:55 PM
Creation date
4/20/2015 3:34:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> • :��;G��11:_.. ?..��;'Ir�G OF `��iE U�O?�O CGL�?vC?L ��.��D :�rxlL 11 , 1977 r dce 14 <br /> � The proposed loc�tion of the f;arina is in an FLOODi��AY AZAPS _ <br /> �_rea designa�ed as a "Sheet Flow Area" , which (Continued� � <br /> �� ans that if the first floor of a building <br /> onstructed in this area is loc�ted one to <br /> � ��wo ieet above the elevation of the road, no <br /> • structural problems are anticipated from <br /> flooding. Drainage in the sheet flow area is <br /> � ;:dec�uate to prevent flooding over the entire <br /> area. � <br /> � <br /> End of let�er. <br /> � <br /> Cauncil I��ee�ing - April 11, 1977 <br /> � <br /> � 1✓r. Greg Frank also informed the City Council <br /> that Barr Engineering Company will be completing <br /> � �he final Floodway r.�aps and presenting them <br /> to the City Council at some future date for <br /> � their final approval. <br /> � r�ayor Van Nest moved, Paurus seconded, to <br /> i condition the proposed building at Stubbs Bay <br /> r�arira,based on trie City FpQi:l��r� s report on <br /> ` �. he Floodway tf�ps , as part of the conditions <br /> to be met pursuant to a nermit being issued. <br /> � �"iOL� On � .-'�V�'S �S� - i`�d��S ��� , <br /> � <br /> + _`avor �r�d Van ?�est zTioved, Taurus seconded, SEi�:ER S�RVICE A�,�S <br /> �o retain Sewer Service Area 7 & 8 as a rural 7 & 8 <br /> � service area. Included in the Sewer Service <br /> Area 7 & 8 is the Crystal Bay Area C and the <br /> � r�innetonka Bluffs Area G, which are recognized <br /> as two possible potential pollution sources <br /> � �nd will be progra�ed for connection to tne <br /> , Orono-Long Lake interceptor, with construction <br /> commencing within three years after completion <br /> � of interceptor construction. The remaining <br /> areas, or symbols at scattered loca�ions <br /> � ��.�orughou� Sewer Service Areas 7 & 8 are <br /> recognized as meeting mini�um State standards <br /> � and zoning requirements and will not require <br /> • municipal sewer service until 1990 or later. <br /> The long-range plan for municipal sewer <br /> � connection is 1977 to 1983 - none; 1983 to <br /> 1984 , or symbols C & G, 1985 to 1°90 - none. <br /> � ^�o�_�� on , �yes (5) - Nay s (0) . <br /> � <br /> � <br /> � <br /> � <br /> � <br /> � � <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.