Laserfiche WebLink
OROi10 COUNCIL P�IEETING HELD NOVEMBER 8, 1976 Page 10 <br /> P�1r, Bill Gagne, owner of 77.13 acres loCated at GAGNE PROPERTY SE6�7ERS <br /> �he northeast quadrant of intersection #12 and #12 & Old Crystal Bay Rd. <br /> ld Crystal Bay Road requested the status of the <br /> availability of sewer at that location. Acting <br /> T•iayor ti�Talter r2assengale stated that the Long <br /> Lake Engineer had informed the City of Orono <br /> approximately three years ago that there ��ere <br /> only 20 units available to the existing sewer <br /> line to Long Lake because of the hy�lraulic <br /> overload of the system. r1r. Gagne asked why <br /> a metro sewer line could not be constructed to <br /> tlzat areae i��Ir. Brad Van Nest stated that it <br /> was a 1�Ietro Council decision to eliminate the <br /> interceptor in that particular area. P�ir. Van <br /> I1est said that the availability of sewer_s is <br /> the basis for development in this area. Acting <br /> IZayor [•dalter T�lassengale request�d City s�aff to <br /> review the units assessed to this piroperty and <br /> the current status of the existing sewer line <br /> serving that acreage. <br /> P-1r. John Lobben addressed the Council and read VO-TECH SCHOOLS <br /> into the record the foliowing s�atemento <br /> 6de are taking this opportunity to request your <br /> ^onsideration of the Joint Independerit 5�hool <br /> istrict No. 287 need for sewer �ervi�� to its <br /> pro�osed West Site Campus loCater� i.�nmediately <br /> north of County Road No. G in P2ec�ii�A� <br /> As you khow, our ti9es� 5it� Cam�r�il� prr�perty is <br /> 171 acr�s in size (w th 23 p�o bsed at�ditional <br /> acres) being four quarter sec��}�i�a �titc� a 10 acre <br /> parcel bordered particall�i on tH� west by Haiuestead <br /> � Trail and on the east by the I�2�t�irla-Morningside <br /> residential development. We propose to develop <br /> a cor.lplete area vocational-technical school <br /> , complex consisting primarily of a main building <br /> eight acres in size with a student capacity of <br /> 2,400 high school, post-secondary and adult <br /> education students on a multi-shifted basis> <br /> Our current development schedule is tentative <br /> because we are not able to program the various <br /> governmental authorizations which must be obtained. <br /> However, we hope to commence campus construction <br /> activities in 1978 with the detail design phase <br /> of the project. This would mean sewer service <br /> facilities will be needed by the year 1980. <br /> Our Joint Board, consisting of representatives <br /> roia each of our thirteen suburban Hennepin County <br /> � �nde�endent school district participating schools, <br /> has determined and established there is a need <br /> for a vocational-technical school in western <br /> Hennepin County. Such a facility will require (Continued) <br />