My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-13-1976 Council Meeting Minutes
Orono
>
City Council
>
Minutes
>
1970-1979
>
1976
>
09-13-1976 Council Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2015 12:07:20 PM
Creation date
4/20/2015 12:07:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�. OROIdO COUNCIL P•ZEETING HELD SEPTEP�BER 13 1976 <br /> � � Page 22 <br /> The attached tabulation sheet shows the results <br /> • of five tests for gradation of the seal coat 1976 SEAL COATIT�IG PROG.?2Ai1 <br /> � aggregate material that were performed by T�ain (Continued) <br /> City Testing and Engineering Laboratory, Incor- <br /> � porated. You will note, the gradation limits <br /> liave not been met and the contractor has been <br /> � unable to furnish material which meets the <br /> Liinnesota Highway Department Specifications, <br /> • 3127 for FA-2 T�laterial, In addition, the linits <br /> proposed under Change Order No. 1 to the contract <br /> � which would modify the FA-2 gradation limit <br /> � requirements have not been met. Since the completion <br /> date as set forth in the contract documents is <br /> � August 31, 1976 , the seal coating in this <br /> geographic region should not be done after <br /> S September 15, 1976, due to temperature conditions, it <br /> is our opinion that an extension of the completion <br /> • date for sealing on this project would not be <br /> � in the best interests of the city. <br /> , September 3, 1�76 letter to Skeets Held, Inc. <br /> from ��alter R. Benson o <br /> • <br /> ihe purpose of this letter is to notify Skeets Held, <br /> • Inc. as contractor for the Orono Seal Coating <br /> and Bituminous Overlay Project for 1976 of the <br /> � City°s intent to terminate the contract between <br /> ��Skeets Held, Inc. and the City of Orono under <br /> the provisions of the contract agreement and <br /> � documents as outlined in Section 2-35 of the <br /> Specifications for the subject project. <br /> • <br /> Paurus moved, Searles seconded, to adopt. REsoluticn RESOLUTIOI� #714 <br /> � 3�714, A Resolution to terminate the contract m <br /> between Orono and Skeets Held, Inc. for 1976 erminate Contract <br /> � Seal Coating and Bituminous Overlay Project. Skeets Held, Ince <br /> � Plotion, Ayes (4) - Nays (0) . <br /> • <br /> Butler moved, Paurus seconded, to approve the <br /> � salary increase for Patricia Higus, Orono Li uor S�'ARY INCREASE <br /> Store, from $2.9p per hour to $3.10 per hourq Patricia Hiqus <br /> � effective September 6, 1976. l�otion, Aves (4j _ <br /> • I1ays (0) ' <br /> � i�ick Benson, City Administrator, stated that in PLATTED STREET <br /> � July of 1976, I��r. Fred Ryan of 1345 North Arm <br /> Drive requested that the City mow a piece of Park Drive <br /> • ground on the northwest corner of Park Drive and <br /> County Road 151, insisting that, according to <br /> � a plat map, this is ark <br /> it raowedo I have checkedptheeplatamapsainlour <br /> ffice and have checked with the Drafting Depart- <br /> :ent at IIennepin County. There is no record of <br /> a designated park for that piece of c�round, nor <br /> � cloes it say why that property has "park" stamped <br /> on ite It does indicate that it could be a platted (Continued) <br /> • <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.