My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-27-1976 Council Meeting Minutes
Orono
>
City Council
>
Minutes
>
1970-1979
>
1976
>
09-27-1976 Council Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2015 12:07:16 PM
Creation date
4/20/2015 12:07:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> � ORONO COUNCIL T�EETING HELD SEPTETZSER 27, 1976 Page 21 <br /> • Leaves and small items will have to be bagged FALL CLEANUP DAY <br /> and tied. Newspapers and all paper products (Continued) <br /> �nust be tied securely. No scavenging wi].1 <br /> � be allowed, Orono residents only. <br /> � <br /> Dick Benson, City Administrator, informed the STREET DEPARTDZENT <br /> • City Council that on September 8 and September 15, <br /> 1976, the City of Orono Public [�orks Department <br /> � advertised for a light equipment operator <br /> � for the Street Departmento <br /> � Frorn the applications received, I would EA�PLOYPJIEt1T <br /> recommend P�Ir, Dale S. Skreen, 1502 Deer Hill Dale S. Skreen <br /> � Road, Long Lake, effective October 11, 1976 at <br /> a starting pay rate of $5,00 per hour, <br /> � <br /> • T�Iassengale moved, Searles seconded, to employ <br /> Dale S. Skreen, at a starting salary of $Sa00 <br /> � per hour, effective October 11, 1976o Pqotion, <br /> Ayes (3) - Nays (0) , <br /> � Butler moved, TZassengale seconded, to extend EXTEND COP2PLETION DATE <br /> the completion date for the traffic signal at Traffic Signal <br /> � Highway #12 and Old Crystal Bay Road to November 5, <br /> �1976, conditioned on all additional administrative, <br /> ngineering and related costs to be borne by <br /> Egan t�IcICay Electrical Contractors. r7otion, <br /> Ayes (3) - Nays (0) . <br /> r <br /> � NIr. Brad Van Nest and NTr, John Guthrie, Planning COP4PREHENSIVE SEi^IER PLAN <br /> • Commission members and Comprehensive Sewer Plan <br /> Committee, discussed the status of the City of <br /> � Orono's Comprehensive Sewer Plan, Pir. Van Nest <br /> stated that the committee and the City �ngineer <br /> � are developing urban and rural service areas <br /> which will highlight pockets of developed areas <br /> � that will require sewer service boundaries, The Plan- <br /> ning Commission ��ill review the progress of the <br /> � entire Comprehensive Sewer Plan at its next meeting. <br /> • <br /> � I�4r, Greg Frank, City Engineer, stated that he FAFVIEW STORM [aATER PLAiV <br /> has reviewed the storm drainage plan for the <br /> � Farview Preliminary Plato To facilitate your <br /> review, we are providing the following summaryo <br /> � <br /> • PROIiLEPZo The landowner to the south of the proposed <br /> development is concerned about the increased <br /> runoff volumes that can be expected from the <br /> evelopment as a direct result of the introduction <br /> of impervious covers such as buildup, streets, <br /> and drivewayso In particular, the runoff volumes <br /> � from the drainage area formed by roughly the eastern <br /> 700 feet of the development drains to the south, <br /> • and presents the largest potential problem to the <br /> • adjacent landa (Continued) <br />
The URL can be used to link to this page
Your browser does not support the video tag.