My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-09-1976 Council Meeting Minutes
Orono
>
City Council
>
Minutes
>
1970-1979
>
1976
>
08-09-1976 Council Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2015 4:13:50 PM
Creation date
4/17/2015 4:13:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� , <br /> � ORONO COUNCIL tiSEETING HELD AUGUST 9, 1976 Page 14 <br /> � rZemo from John Gerhardson, Public �^?orks Supervisor FOUR-T^?AY STOP SIGNS <br /> � In 1972 , Willow Drive froM Watertown Road south (Continued) <br /> • to Fox Street was completely upgraded �aith PZSA <br /> funds. when completed, the road had a 24 foot <br /> � bituminous surface and six foot gravel shoulde�s• <br /> � In 1975, ��Tillow Drive, from the Burlington <br /> � Northern bridge s outh to Fox Street, was resurface� <br /> with a 2" bituminous mat with 8' bitur.tinous shoulders, <br /> • <br /> The upgrading and resurfacing has added to an <br /> i existing problem at the intersection of ��]illow Drive <br /> and Fox Streeto I have discussed this problem <br /> � with Lyle Swanson from rdcCombs-Knutson and he has <br /> � checked with the State of I��innesota, They told <br /> him the c�esign change of the intersection could be <br /> �, done with MSA funds. <br /> r I c��ould recommend the design change before installing <br /> a 4-way stop. The reason being that north bound <br /> � traffic on Ulillow Drive would have to stop on an <br /> i incline and uJould have problems gettinq started <br /> ac�ain during the winter. This incline could <br /> � k�e corrected at the time of construction and once <br /> completed, then consider a 4-way stope <br /> • <br /> P2ore information will be presented at the August ?.3, <br /> • 1976 Council meeting, <br /> � <br /> � Searles moved, P2assengale seconded, to hire Tom TErRPORARY LABORER <br /> Pletcher as temporary laborer in the Street Tom Pletcher <br /> � Department at the rate of $2, 30 per hour, <br /> effective August 10, 19?6. P�[otion, Ayes (4) - <br /> � Nays (0) , <br /> � <br /> • Searles moved, P2assengale seconded, to hire TEl�ZPORARY LABORER <br /> rdorman Hamman as a temporary laborer in the Norman Hamman <br /> � Street Department at the rate of $2. 30 per hour, <br /> effective August 11, 1976. Motion, Ayes (4) - <br /> � Nays (0) . <br /> • <br /> PZayor Searles announced a joint puhlic hearing to CORPS OF ENGITIEER'S <br /> � be held by the District Engineer, Corps of Engineers,r�ETIDT� <br /> � and the Commissioner of the Department of Tdatural Gray's Bay Dam <br /> Resources, or officers appointed by them, in the <br /> � City of PZinnetonka Council Chamber, 1n600 2�innetonka <br /> boulevard, Minnetonka, on the llth day of Auc7ust, <br /> � 1976 at 7v00 o°clock P.�7. , or as soon thereafter <br /> � as the matter can he heard, to construct a ��ater <br /> control structure approxirnately 8,000 feet down- <br /> • stream from the Gray°s Bay Dam as to the estahlishment <br /> of an official ordinary high water 929e4 mark for <br /> � Lalce P-7innetonka o <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.