My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-26-1976 Council Meeting Minutes
Orono
>
City Council
>
1976
>
07-26-1976 Council Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2015 4:13:47 PM
Creation date
4/17/2015 4:13:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� , <br /> � ORONO COUNCIL i�2EETING HELD JULY 26, 1�976 Page 19 <br /> • <br /> You will also note any of the °gaps ' in the line, ORONO-MINNETONKA BEACH <br /> � if there are any. It is necessary for the City INTERCEPTOR <br /> of Orono to have easements over all of the property (Continued) <br /> � over which the pipe or lift station is constructed <br /> � which is not in the public right of way. In those <br /> instances, if any, where there is no easement over <br /> � a parcel of property over which the �ipe or lift <br /> station has been constructed, you ��ill note to me <br /> � where there is no easement and will note for me <br /> the legal description of the lo�, the name of the <br /> • owner from 1960 to 1964, and the name of the <br /> � present owner. <br /> � Tt is my understanding that this service will cost <br /> the City of Orono $5. 00 per property, or approximately <br /> r $150. 00 for the thirtv properties involved and what- <br /> ever fee is charged by the Registrar of Titles or <br /> i Register of Deeds for certified copies of the <br /> ' easements, �ahich is probably $3.50 per easement. <br /> It is also my understanding that you will have <br /> � completed this task in fourteen days, or in other <br /> words by Wednesday, August 4, 1976, unless various <br /> � unforeseen problems arise in the acquisition of <br /> the certified easements. <br /> � <br /> As I noted, the City of Orono plans to assign its <br /> • interests in these easements to the Metropolitan <br /> • �^7aste Control Commission once u�e have obtained <br /> certified copies from you. <br /> � Please bill the City of Orono directly for services <br /> � rendered with a copy of the bill to the undersigned. <br /> � Bruce t�Ialkerson <br /> • <br /> � IZr, Rick Sathre, City Engineer, in£ormed the City RING ROUTE P�lEETING <br /> Council that a meeting has been tentatively arranged <br /> � with representatives of Hennepin County Auqust 11., 1976 <br /> to discuss Hennepin County's proposed upc�rading of <br /> � County Road #110, Orono°s ring route concept, Tanager <br /> Lake bridge, and the location of the Orono-Long Lake <br /> � In-':.�.r^�,.tor. <br /> � <br /> ` The City Council authorized the staff to send a ABANDONPZENT - #51 <br /> letter to each involved property owner concernin_q Hendrickson Bridge <br /> � Lhe proposed Hennepin County abandonment on County <br /> Road #51 adjacent to the Hendricicson bridge. <br /> • <br /> � P,Zr. Rick Sathre, City Engineer, stated that he MINI-WATERSHED STUDY <br /> � will initiate the t�Iini-watershed Study for the <br /> area located at the location of the Good Shepherd <br /> � Lutheran Church site. <br /> � <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.