My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00382 - septic pressure bed
Orono
>
Property Files
>
Street Address
>
L
>
Lakeview Parkway
>
425 Lakeview Parkway - 06-117-23-32-0004
>
Septic
>
2016-00382 - septic pressure bed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:26:28 PM
Creation date
4/28/2017 12:20:22 PM
Metadata
Fields
Template:
x Address Old
House Number
425
Street Name
Lakeview
Street Type
Parkway
Address
425 Lakeview Pkwy
Document Type
Septic
PIN
0611723320004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�• <br /> ` � �� rs � . <br /> �-,3 R��o <br /> , � cop� <br /> l0� � � <br /> 3� �/°/"t � � �� � T�� Joseph Olson D.B.A. <br /> Rusty Olson's--Soil and Percolation Testing <br /> .Joseph J. Olson--iNPCA License#810 <br /> 11�81 Riven�iew Rd. �IE, Hanover, MN 55341 <br /> (763) 498-8779 Fax (763) 498-8290 <br /> October 15,2015 <br /> Norton Homes <br /> 425 Lakeview Blvd. <br /> Orono. Hennepin County <br /> This on-site Sewage 7reatment System is designed for a Ty�pe 1,five bedroom home in accordance with the <br /> Minnesota Pollution Control Agency Chapter 7080 and local ordinances. <br /> The periodically saturated soils were located at 14-18�hes(mottled soil). Due to the periodically <br /> saturated soils,a pressurized mound system with 6 inches of rock will need to be installed to treat the septic <br /> eftluent. The bottom of the treatment area must be located at least 3'above the saturated soils.This system <br /> is designed with 6 inches of rock. <br /> ✓ <br /> The soils at a depth of]�"have a percolation rate averaging 8.8 MPI. <br /> All tanks need to be insulated if there is less than two feet of cover over the top of the tanks.Clean outs <br /> must be installed on the end of the laterals for maintenance. <br /> � <br /> Use 7!32 inch perforations on the faterals. <br /> ✓ <br /> A 1300 gallon pumping chamber will need to be installed to lifr the effluent to the treatment area. The <br /> power supply and Switches must be located outside the manhole and pumping chamber in a weatherproof <br /> enclosure.A warning device must be installed with light and sound devices;this is in case of a pump <br /> failure.The manifold and supply line must have back drainage to the pumping chamber. <br /> Kee�all heavv eauioment off of the aroaosed treatment areas before durinQ and after construction <br /> The area around both sites must be fenced off bv the contractor before anv constructioo beeins <br /> 1�'ith proper installation and maintenance,this system should have no problem in treating septic effluent <br /> effectively. Nothing other than gray water,(laundry,showers,etc.)Human water and toilet tissue should be <br /> disposed of into the septic tanks.Garbage disposals are not recommended.Additives must not be used they <br /> may cause harmful damage to your septic system. It is recommended that you pump the septic tanks every <br /> two years. <br /> Si relv, <br /> Joseph J.Olson CITY OF ORONO <br /> SEPTIC P MIT P N EVIEW <br /> INSPECT <br /> DATE � PERMITNO. �� -- O6�BZ <br /> � APPROVF.D AS SliA:�+t[7'TEU <br /> APPROVED W(TH CORRECTIQN$AS NOTED <br /> NOT APPRQVED-CORRECT&RESliB�tI�' <br /> THtS SYSTEM IS DESiGNFD F{1R These comments are for your information. Ail work sliail be done <br /> IuV,�l}�+DrAt► in full compliance with all applicable septic and•r.oning cude. <br /> �BEDROOMS. AI�( p,1iRG�{JE���� Requirements including items noi specit'icully notcd in tl�is review. <br /> OF BEDROOMS INVAtlDATES TNIS DESiGN• K6GP THIS PLAN SET ON 5lTE AT ALL?lMGS <br />
The URL can be used to link to this page
Your browser does not support the video tag.