My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00382 - septic pressure bed
Orono
>
Property Files
>
Street Address
>
L
>
Lakeview Parkway
>
425 Lakeview Parkway - 06-117-23-32-0004
>
Septic
>
2016-00382 - septic pressure bed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:26:28 PM
Creation date
4/28/2017 12:20:22 PM
Metadata
Fields
Template:
x Address Old
House Number
425
Street Name
Lakeview
Street Type
Parkway
Address
425 Lakeview Pkwy
Document Type
Septic
PIN
0611723320004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- OSTP Mound Materials Worksheet UNIVERSITY <br /> Mlnnesota Poilution OF MINNESOTA <br /> Controi Agency 1.�' <br /> ProjectlD: v 07.14.15 <br /> A• talalate Bed �rock)Volume:Bed Length �2.0 X Bed Width 2.81 X Depth =Vo(ume ft') <br /> 63.0 ft X 10.0 ft X 0.8 = 504.0 ft' <br /> Divide ft'by 27 ft'iyd'to catcutate wbic ards: <br /> 504.0 ft' a 27 = 18.7 yd' <br /> Add 20�for construttability: 18J yd'X 1.2 = 22,4�yd3 <br /> B. Calcutate Cleon Sand Volume: <br /> Volume Under Rock bed:Averoge Sand Depth x Media width x Media Length =cubic feet <br /> 2.4 ft X 10.0 ft X b3.0 ft = 1512A ft' <br /> For a Mound on a slope from 0-1% <br /> Volume from Length=��Upslope Mound Height• 1)X Absorption Width Beyond Bed X Media Bed length) <br /> ft - 1) X �� X ft = <br /> Volume from Width=��Upslope Mound Height- t)X Absorption Width Beyond Bed X Media Bed Width) <br /> ft -1) X X ft = <br /> Tota!Uean Sand Volume: Volume Jrom Lenyth- Volume from Width t Volume Under Medio <br /> ft' - �� ft3 + ft1 = ft} <br /> For a Mound on a slope Qreater than 1% <br /> tlpsiope Volume: (�Upslope Mou�d Hei ht - 1)x 3 x Bed Lenqth)�2=cubic feet <br /> (l 3.2 ft - 1) X 3.0 ft X 63.0 )-2= 204.8 ft3 <br /> Downslope Volume:((Downslope Height- i) x Downslope Absorption Width x Medra Len3th��2=cubic feet <br /> (� 5.0 ft•1) X 16.0 ft X 63.0 )-2= 1999.2 ft' <br /> Endslope Vo(ume:(Downslope Mound Height- 1) x 3 x Media Wid[h =cubic fee[ -� <br /> ( 5.0 ft-1 ) X 3.0 ft X 10.0 ft = 119.0 �ft' <br /> ---� <br /> Total Clean Sond Volume:!lpslope Volume +Downslope Volume *Endslope Volume t Volume Under MediQ <br /> 204.8 ft' � 1999.2 ft' . 179.0 f�' , 1512.0 ft'- 3835.0 ' <br /> ft <br /> Divide ft;by 27 ft'ryd3 to calculate cubic yards: 3835.0 ft3 : 27 = 142.0 yd' <br /> Add 20%for constructabitity: 142.0 � - <br /> yd X 1.2 - 170.4 yd <br /> C. Calculate Sandy 8erm Votume: <br /> Totol Berm Voiume/approx): (�Avg.Mound Height 0.5 Tt topsoit�x Mound Width x Mound Le�gth)�Z=cubic feet <br /> ( 4•� � 0.5 )ft X 53.0 ft X 93.0 )-2= 8790.1 ft' <br /> Total Mound Volume•C(ean Sand votume-Rock Volume=cubic Jeet <br /> 8790.� ft' - 3835.0 ft' - 504.0 ft' = 4451.1 {t' <br /> --� <br /> Divide ft3 by 27 ft''!yd'to calcutate wbic yards: 4451.1 f�3 � 27 = 164,q Yd� <br /> Add20%forconstructabitity: 1�.9 yd' x 1.2 = 197.8 yd <br /> D. Calculate Topwi(Material Volume:Toto!Mound Width X Total Mound tength X.5 ft <br /> 53.0 ft X 93.0 ft X 0.5 ft = 2464.5 ft' <br /> Divide f[3 by 27 ft'/yd3 to calwtate cubic yards: Z464•5 ft' : 27 = 91.3 yd� <br /> Add 20%for constructability: 9�•3 yd3 x 1.2 = 109.5 3 <br /> yd <br />
The URL can be used to link to this page
Your browser does not support the video tag.