My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00382 - septic pressure bed
Orono
>
Property Files
>
Street Address
>
L
>
Lakeview Parkway
>
425 Lakeview Parkway - 06-117-23-32-0004
>
Septic
>
2016-00382 - septic pressure bed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:26:28 PM
Creation date
4/28/2017 12:20:22 PM
Metadata
Fields
Template:
x Address Old
House Number
425
Street Name
Lakeview
Street Type
Parkway
Address
425 Lakeview Pkwy
Document Type
Septic
PIN
0611723320004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 5. DISTRIBUTION MEDIA: REGISTERED TREATMENT PRODUCTS: CHAMBERS AND EZFLOW <br /> A. Enter Dispersal Media: <br /> B. Enter the Component: Length: C�ft Width:�ft Depth:�ft <br /> C. Number of Components per Row = Bed Length divided by Component Length (Round up) <br /> C� ft : �� ft = C�components/row <br /> D. Actual Bed Length = Number of Components/row X Component Length: <br /> �components X ��ft = ��ft <br /> E. Number of Rows = Bed Width divided by Component Width (Round up) <br /> C� ft - C� ft = C� rOws Adjust width so this is an whole number. <br /> F. Total Number of Components= Number of Components per Row X Number of Rows <br /> C� X �� _ �components <br /> 6. MOUND SIZING <br /> A. Calculate Minimum Clean Sand Lift: 3 feet minus Depth to Limiting Condition = Clean Sand Lift <br /> 3.0 ft - 1.3 ft = 1.7 ft Design Sand Lift (optionat): ��ft <br /> B. Catculate Upslope Height: Ctea� Sand Lift + media depth +cover (1 ft.) = Upslope Height <br /> 1.7 ft + 0.5 ft + 1.0 ft = 3.2 ft <br /> C. Setect Upslope Berm Multiplier (based on tand slope): 2.41 <br /> La�d Slope 9�0 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Upslope Berm 3:1 3.00 2.91 2.83 2.75 2.68 2.61 2.54 2.48 2.42 2.36 2.31 2.26 2.21 <br /> Ratio 4:1 4.00 3.85 3.70 3.57 3.45 3.33 3.23 3.12 3.03 2.94 2.86 �.78 2.70 <br /> D. Calculate Upslope Berm Width: Multiptier X Upslope Mound Height = Upslope Berm Width <br /> 2.41 ft X 3.2 ft = 8.0 ft <br /> E. Calculate Drop in Etevation Under Bed: Bed Width X Land Stope = 100 = Orop (ft) <br /> 10.0 ft X 18.0 46 = 100 = 1.80 ft <br /> F. Calculate Downstope Mound Height: Upslope Height + Drop in Elevation = Downslope Height <br /> 3.2 ft + 1.80 ft = 5.0 ft <br /> G. Select Downslope Berm Multiplier (based on tand stope): 7.00 <br /> land Slope°/a 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Downslope 3:1 3.00 3.09 3.19 3.30 3.41 3.53 3.66 3.80 3.95 4.11 4.29 4.48 4.69 <br /> Berm Ratio 4:1 4.00 4.17 4.35 4.54 4.76 5.00 5.26 5.56 5.88 6.25 6.67 7.14 7.69 <br /> H. Calculate Downslope Berm Width: Multiptier X Downslope Height = Downslope Berm Width <br /> 7.00 x 5.0 ft = 34.8 ft <br /> I. Catculate Minimum Berm to Cover Absorption Area: Downslope Absorption Width + 4 feet <br /> 16.0 ft +� 4� ft = 20.0 ft <br /> �--- <br /> J. Design Downstope Berm = greater of 4H and 41: 35.0 ft <br /> K. Select Endslope Berm Multiptier: 3.00 (usually 3.0 or 4.0) <br /> L. Calcutate Endstope Berm X Downslope Mound Height = Endslope Berm Width <br /> 3.00 ft X 5.0 ft = 15.0 ft <br /> M. Calcutate Mound Width: Upstope Berm Width + Bed Width + Downslope Berm Width <br /> 8.0 ft + 10.0 ft + 35.0 ft = 53.0 ft <br /> N. Catculate Mound Length: Endslope Berm Width + Bed Length + Endslope Berm Width <br /> 15.0 ft + 63.0 ft + 15.0 ft = 93.0 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.