My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-17-1976 Council Meeting Minutes Public Hearing/ring route
Orono
>
City Council
>
Minutes
>
Historical
>
1970-1979
>
1976
>
05-17-1976 Council Meeting Minutes Public Hearing/ring route
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2015 4:13:37 PM
Creation date
4/17/2015 4:13:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� PUBLIC HEARING OF THE ORONO COUNCIL MAY 17, 1976 Page 2 <br /> � <br /> Surfacing: <br /> � Bituminous Surface: <br /> MHD 2341 - 3300 Ton @ $14 = $46,200 <br /> � Bituminous Tack - 1390 Gal @ 0. 75 = $ 1,050 <br /> � MHD 2331 - 5500 Ton @ $13 = $71,500 <br /> Gravel Base <br /> � Class 5 - 6600 Ton @ $3. 50= $23,100 <br /> Class 4 - 4100 Ton @ $3.00= $12 , 300 <br /> ` Contingencies $I5, 400 <br /> $169 ,550 <br /> • <br /> Miscellaneous <br /> � Pedestrian Underpass (10 X 10 Box) <br /> � 90 L.F. @ 420 = $37, 800 <br /> Drainage Culverts: 150 L.F. @ 12 = $ 1, 800 <br /> � Restoration: <br /> Sodding = $ 7, 300 <br /> � Seeding = $ 4,000 <br /> Contingencies = $ 5,100 <br /> � $56,000 <br /> • <br /> Total Construction Cost: $459 ,150 <br /> � <br /> Legal, Administrative & Engineering: $ 46,000 <br /> � Total Project Cost: $505,150 <br /> • <br /> Available Funds (Through 1976) - $300, 000 <br /> � Estimated 1977-1978 Funds - $130 ,000 <br /> • 430, 000 <br /> � Mr. John Miller, Chippewa Lane, submitted the <br /> � following petition from residents in the area <br /> stating that: <br /> 0 <br /> 1. Are projected costs j:ustified? <br /> • 2. Will the proposed ring route reduce existing <br /> • traffic loads on other City streets? <br /> 3. We need adequate mass transit <br /> � Petition <br /> � <br /> We, the undersigned, are opposed to the construction <br /> � of the proposed segment of the ring belt road which <br /> would connect the intersection of County Road #84 <br /> • and #19 to that of Watertown Road and County Road #6 <br /> . in Orono Precinct No. 4. <br /> � The proposed roa�. will cut through an essential <br /> and extensive watershed eventually feeding into <br /> � Lake Minnetonka, and which drains naturally an <br /> area east of County Road #6 and #19 , and to a larger <br /> � extent, an area east and south of Maple Plain. <br /> Instead of being held �,n natural marshland, water <br /> � will have to be drained through large culverts. <br /> • (Continued) <br /> � <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.