Laserfiche WebLink
� OROVO COUNCIL P�iEETING HELD r4AY 10, 1976 Page 4 <br /> � I3utler moved, i4assengale seconded, that the RIP RAP, FILLING & GRADINC <br /> rip rap permit, seawall, filling and grading 3020 Casco Point Road <br /> ��aithin �5' of shoreline request for Joe <br /> � Braun, 3020 Casco Point Road, be referred <br /> to the Planning Commission. t�Iotion, Ayes (5) - <br /> f Nays (0) . <br /> � <br /> A Butler moved, P-qassengale seconded, that the CONDITIONAL USE PERP4IT <br /> conditional use permit for Stewart Perry, 2975 Casco Point Road <br /> � 2975 Casco Point Road, be referred to the <br /> Planning Commission. T�otion, Ryes (5) - <br /> � Nays (0) o <br /> • <br /> Henry T�Suhich, Building & Zoning Administrator, SUBDIVISION <br /> • stated that the 315 East Grant Corporation, 3340 Shore2ine Drive <br /> 3340 Shoreline Drive, is requesting approval <br /> � of subdividing Parcel 2815 into two lots <br /> + (1 & 2) . This parcel is located on the N.E. <br /> quadrant of the intersection of County Roads <br /> � �15 & #190 The area nearest the intersection <br /> is zoned commercial (B-l� o The remainder is <br /> • including the marsh and is zoned residential <br /> (LR-1B) . The proposed subdivision would <br /> � follow the border line hetween the two zones. <br /> Each parcel would therefore lie in its own <br /> �espective zoned district. <br /> � Lot 1 would consist of 71,000 sq. fte of <br /> � commercially zoned lando The major portion <br /> of Lot 2 is marsh, No building permit could <br /> • be issued on this lot unless it qualifies <br /> • under the ordinance. The developer has not <br /> indicated any desire to develop this parcel <br /> � as yete We might suggest a conservation ease- <br /> ment on Lot 2, <br /> • <br /> I would recommend approval of the subdivision <br /> � as it would divide the two permitted land useso <br /> � I was not aware of the filling and grading <br /> that has been going on in the adjoining area <br /> � in TYinnetonka Beach until I made a site <br /> � inspectione It appears that some of the <br /> grading has extended into the Orono area. We <br /> � should resolve this problem while considering <br /> this subdivision proposal. <br /> • <br /> If Lot 2 can be considered a buildable residential <br /> � site, a park dedication fee would also be <br /> � forthcoming. However, if we do obtain a <br /> �conservation easement, we could waive this feeo <br /> (Continued) <br /> • <br /> � <br /> f <br />