My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-23-1976 Council Meeting Minutes
Orono
>
City Council
>
Minutes
>
Historical
>
1970-1979
>
1976
>
08-23-1976 Council Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2015 4:13:33 PM
Creation date
4/17/2015 4:13:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> � � OROi�O COUNCIL MEETING HELD AUGUST 23, 1976 Page 2 <br /> ♦ Mr. Rick Sathre reviewed the preliminary assessment pUBLIC HEARING <br /> � stating that as requested, we submit herewith the (Continued) <br /> reliminary assessment rolls for the subject Storm <br /> � Sewer project. <br /> � The amount to be assessed has been calculated as <br /> followsa <br /> • <br /> � Construction Costs $13,058.95 <br /> Engineering, staking, inspection <br /> i and preparation of assessments 3,427.75 <br /> Fiscal, legal, and administrative <br /> � costs 1,648.67 <br /> � TOTAL COSTS $18,135. 37 <br /> ! PZinus Hennepin County Share 3,726.51 <br /> Minus City Share (10.7�) 1,940, 48 <br /> � TOTAL TO BE ASSESSED $12,468. 38 <br /> i The City share of the project cost has been based <br /> � upon City ownership of 10. 7� of the watershed <br /> contributing area. The properties unc?er private <br /> � ownership within the watershed contributing area <br /> have been listed with their corresponding areas <br /> � and assessments on the attached preliminary <br /> assessment rolls. <br /> �uestion from the audience: Was the amount <br /> � of fill that was graded into the ravine adequate <br /> � and according to proposed plans? Mr. Sathre <br /> replied that the dirt fill was completed according <br /> • to the �riginal plans, but a final grading and <br /> black dirt base for seed was to be completed this <br /> � week. �uestion from audience: Is the street <br /> � drainage and curbing complete? Rick Sathre replied, <br /> Yes, the drain structure and curbing was constructed <br /> � as requested by Hennepin County Public �aorks Department. <br /> Mayor Searles requested the City Engineer to review <br /> • the entire project to assure us that all work has <br /> been completed and report back to the City Council <br /> � at the September 13, 1976 Council meeting with <br /> a final recommendation and adoption of the assess- <br /> � ment roll. After all concerned property ocaners <br /> � were afforded an opportunity to be heard, the <br /> public hearing was closed at 8a05 P.r�7. <br /> • <br /> � Mayor Robert Searles discussed Orono's progress MAYOR SEARLES REPORT <br /> with Hennepin County concerning future construction Ring Route <br /> � stating that most of you are familiar with Orono's Tanager Lake Bridge <br /> � struggle to keep our lakeshore areas from over- Sewer Interceptors <br /> velopment leading to new forms of lake pollution. Gray°s Bay Dam <br /> ne quastion of expansion of County Road 15 has <br /> been a focal point of this environmental protection <br /> � issue. I am �tappy to report to you that the years <br /> of �•�ork with State and County agencies are now <br /> • beginning to pay off. (Continued) <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.