Laserfiche WebLink
� ' ' <br /> • ORONO COtJNC IL Y I�ETIrIG HELD I]ARCH 2 2, 19 7 6 Page 7 <br /> � ilro Van Nest recommended that the entire ORONO-LONG LAKE <br /> watershed .study be consolidated with the INTERCEPTOR STUDY <br /> �rono-Long Lake rnterceptor Study. (Continued) <br /> • <br /> Acting I�ayor P�assengale stated that we need <br /> � people and related agency participation, �ae <br /> are already ten years late in initiating this <br /> r type of studya <br /> + Acting i7ayor Massengale requested P�2r. Van Nest <br /> � to arrange a joint meeting wi�h the P-�innehaha <br /> Creek taatershed District Bdard of l�7anagers, <br /> � the Orono-Long Lake Interceptor Committee, <br /> and the Orono Council as soon as possible. <br /> • <br /> � Henry I�iuhich, Building & Zoriing Administrator, NAVARRE REZONITIG REVIEW <br /> � stated that in reviewing the studies and reports <br /> referred to by the Planning Commission and <br /> � Council in determing the rezoning of the City <br /> of Orono, I have cbme across some interesting <br /> � data which I would like to bring to the <br /> attention of Counc�.l to bear out the rationale <br /> r in the rezoning of portions of t�� commercial <br /> . area in Navarre to a residential zone. <br /> � The Navarre Task Fotce consisting of many of <br /> "=he property owner� in the a�ea, after tn�ch <br /> � review and study �eported their recommendations <br /> to be that as adopted by the Council, The <br /> ♦ current zoning of these areas are consistent <br /> with the recommendations of the Task Forceo <br /> � <br /> • T arn enclosing several pages from the Navarre <br /> Task Force report ta confirm these decisionso <br /> , I am also enclosing a copy of one of several <br /> maps on the rezoning classification as proposed <br /> M by the Navarre Task Force, All of the other <br /> maps in the report are very similar in nature. <br /> � The total areas of the various recommendations <br /> • differ slightly. <br /> � Iienry i�iuhich, Building & Zoning Administrator, CONDITIONAL USE & <br /> � discussed the status of the conditional use VARIANCE <br /> permit and variance for access building on 1960 Lakeview Terrace <br /> S through street requested by Ronald R. Ross, <br /> 1960 Lakeview Terrace. <br /> � <br /> � Henry liuhich, Building & Zoning Administrator, CONDITIONAL US� PERT�IT <br /> � discussed the status of John Lambin's request 3340 Shoreline Drive <br /> �or a Burger King Restaurant, 3340 Shoreline <br /> riveo for a conditional use permit and variance. <br /> • Acting rlayor I�Iassengale instructed staff to <br /> puruse the Navarre Lane status, parking require- <br /> � ments, and ingress and egress problems. <br /> r <br />