My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-08-1976 Council Meeting Minutes
Orono
>
City Council
>
Minutes
>
1970-1979
>
1976
>
03-08-1976 Council Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2015 3:47:41 PM
Creation date
4/17/2015 3:47:38 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
♦ <br /> � ORONO COUTICIL P�EETING HELD MARCH 8, 1976 Page 10 <br /> � Report should include: A, J. NICKOLA5 <br /> IcE Rink Consultant <br /> �o �stimate of marke� for �.rit�oc�� ice time �aith (Continued) <br /> � related fee scheduleso <br /> 2. Analysis of key factors relating to major <br /> � location alternati'ves includingo <br /> a) One sheet at a ceritral Orono Village <br /> • location between t e two schoolse <br /> � b) One ice sheet on Piound or Orono school <br /> propertyo <br /> � c) �1'wo ice sheets,one at each school locatione <br /> 3. Recommendation on location. <br /> S 4, Analysis of design and engineering features, <br /> operating characteristics and pro forma <br /> � operating statements for a: <br /> a) Plinimum capital and operating cost <br /> � covered ice sheet to operate 8 months <br /> • per year as ice arena. <br /> b) Larger arena ($600-�300P2) to operate 12 <br /> � months per year as ice arena. <br /> � These analyses should include construction and <br /> operating cost estimates, pro forma profit/loss <br /> • statements (including debt coverage) , design, <br /> . engineering and operating characteristics, <br /> suggested skating programs, staffing and <br /> management suggestions for both of the above <br /> �lternatives. <br /> � 5o Recommendation on arena size based on #4 above. <br /> 6o Recorimendation on how to obtain capital funds <br /> � for the projecte <br /> 7, Recommendation on how to solicit favorable <br /> � community support for the project. <br /> � 8. Identify problems and pitfalls and how to <br /> avoide <br /> � T-layor Searles stated that the City Council would <br /> a want a comparison of supportive population in <br /> square miles encompassing the projected ice <br /> � arena with other arenas in the municipalities <br /> throughout the State. <br /> • <br /> � Paurus moved, Butler seconded, to instruct the <br /> staff to draft and expedite a contract with <br /> � I�1r. A. Jo Nickolas to provide an ice arena <br /> feasibility study. Total costs not to exceed <br /> � �3,000. I•lotion, Ayes (4) - Nays (0) . <br /> • <br /> • Butler moved, P�assengale seconded, to accept BID A[rJARD <br /> �Yie low bid from Skeets Held, Inc. in the SYeets Held, Ince <br /> ` arnount of $27,41.7 for the 1976 street program. 1976 Street Prograr.� <br /> �otion, Ayes (4) - Nays (0) s <br /> � Butler moved, ��iassengale seconded, to accept 1975 FINANCIAL STATEPi�itiT <br /> the 1975 Financial Statement and ordered it <br /> � posted in four strategic places in the City. <br /> i��otion, Ayes (4) - Nays (0) o <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.