My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Historical data referencing swale
Orono
>
Property Files
>
Street Address
>
C
>
Casco Point Road
>
3026 Casco Point Road - 20-117-23-34-0026
>
Land Use
>
Historical data referencing swale
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:59:10 PM
Creation date
4/27/2017 11:11:08 AM
Metadata
Fields
Template:
x Address Old
House Number
3026
Street Name
Casco Point
Street Type
Road
Address
3026 Casco Point Road
Document Type
Land Use
PIN
2011723340026
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zoning File #1970 <br /> October 12, 1994 <br /> Page 3 <br /> Staff Recommendation <br /> To recommend approval of the grading and drainage plan provided by Edward H. Sunde <br /> of Sunde Land Surveying Inc. dated the 29th of August, 19941ocating the temporary stock pile <br /> area for the 450 cubic yards of materials to be excavated beneath the proposed house pad and <br /> the conceptual grading plan involving both Lots 1 and 2, Block 1, Kelly 2nd Addition, subject <br /> to the following conditions: <br /> 1. Prior to application being scheduled before the Council, applicant must provide <br /> a final grading plan setting forth the method of conveying drainage from lower <br /> elevations at walkout on Lot 1, Block 1 through Lot 2 to the eastern drainageway. <br /> This shall be achieved via an above ground drainage swale or below ground tile <br /> system. If below ground tile system is proposed, applicant must provide the <br /> necessary hydraulic information for City Engineer's review. In any case, before <br /> scheduling of this application before Council, the City Engineer must have the <br /> final grading plan to review and approve. <br /> 2. Erosion control shall be installed and maintained around temporary stockpile of <br /> spoils. Erosion control shall be maintained as shown on the grading plan and as <br /> required by the Ciry staff or City Engineer throughout duration of the building <br /> project and until natural groundcover is restored to all disturbed areas. <br /> 3. Both owners of Lots 1 and 2, Block 1, Kelly 2nd Addition shall jointly execute <br /> a land alteration permit to be obtained at the City before final grading can begin. <br /> 4. Others recommended by Planning Commission members. <br /> lsv <br />
The URL can be used to link to this page
Your browser does not support the video tag.