Laserfiche WebLink
� Erosion Control Supplemental Information <br /> Final Stabilization will be provided with (seed, sod, etc): � �� <br /> and 6 inches of topsoil will be added/replaced prior to final stabilization. <br /> Concrete Washout: Location of concrete washout <br /> �!` Off site _Indicated on site plans _Other(description): _Contained on truck: <br /> Vegetation: Protective fencing will be installed as necessary so as to exclude all fill and equipment <br /> from the drip line or critical root zone, whichever is greater, of all vegetation to be retained. <br /> �Yes _Not Applicable _Other(description): <br /> Inspections: An erosion control inspection plan is required for all projects disturbing'/4 acre or <br /> greater.The inspection requirements are as follows: <br /> 1) The individual ident�ed as being responsible for implementing the erosion control <br /> plan mzrst rozrtinely inspect the construction site once every seven days during active <br /> construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 <br /> hozars. <br /> 2) All inspections and maintenance conducted during construction must be recorded in <br /> writing and these records ma�st be retained with the erosion control plan and made <br /> available at the District's request within 24 hours. Records of each inspection and <br /> maintenance activity shall include: <br /> i. Date and time of inspections; <br /> ii. Name ofperson conducting inspections; <br /> iii. Findings of inspections, including recommendations for corrective actions; <br /> iv. Corrective actions taken(including dates, times and party completing <br /> maintenance activities); and <br /> v. Date and amount of all rainfall events greater than 0.5 inches in 24 hours. <br /> Provide the following information for the primary individual responsible for implementing the erosion <br /> control plan: <br /> Name �ti�►1/J `I►� �r�rT �',� <br /> Organization n n��r� �, � 1�i L 1�t K,S a v.rC <br /> . <br /> Phone ���/ /Q���Q� Alternate Phone � 5� �3 y s•� �y,3 <br /> Emai 1 ��pj v+7 I� W 00����_ �V i L 1�G Il.; . C 0 NM <br /> I certify that I am familiar with the requirements of the MCWD Erosion Control Rule and that the <br /> proposed activity will be conducted in compliance with this rule. <br /> �...�s:s,.��..� 1 , <br /> Signature of Applicant ar Autharized Agent Date <br />