Laserfiche WebLink
� <br /> � ORONO COUT�ICIL T�IEETING HELD DEC�I�IBER 8, 1975 Page 17 <br /> � 1�s per I-iennepin County's letter of rZarch 10, NORTI� SFiORE DRIVE RAVI��?" <br /> 19'75, in which they agreec� to share in the cost COSTS <br /> E the nroject; their share of the co�t is (Cnntinued) <br /> • determined to be $3,726.51. Their share <br /> includes 1000 of the cost of constructing the <br /> � catch basins and the catch basin lead ($1,562.50) <br /> � and 14,5% or the remaining costs ($14,924.20 X <br /> 14,5� + �2,164.01) 0 <br /> � The City of Orono's share of the cost of the <br /> � ��rojeet; basecl on City ocanership of 9 0 7 0 of <br /> tiie drainage area, is $1,599.21, <br /> � <br /> • The rermainder of the project cost ($11,160e93) <br /> should be assessed to the benefitted private <br /> + t�roperties at the rate of approximately <br /> �0.026t33 per square foot or $26a. 30 per 10,000 <br /> � square feet. "_'he preliminary assessment rate <br /> is based on an estimated 416,000 square feet <br /> � of assessable private propertyo <br /> � i�Te will prepare an assessment roll for a <br /> • public hearing at a later date in 1976, <br /> , searles moved, ilassengale seconded, to adopt RESOLUTIOtT ;�656 <br /> � Resolution #�656 for Tom Betz, 3775 �ayside 3775 F3ayside Road <br /> oad, subject to review by the City Attorney <br /> ` co be submitted for final Council ap�?roval at <br /> the January 12, 1976 meetingo rlotion, Ayes (5) - <br /> r ilays (0) . <br /> � <br /> • Tir, Doug Hall, Pollution Control Agency represent- INTEFCEPTOR <br /> ative, presented hinself to the City Council to Orono-Long Lake <br /> � discuss the Orono-Long Lake interceptore <br /> � �iayor Searles stated that the lack of time <br /> caused by inadequate time to reviec•� the <br /> � environrnental im�act assessment, couplec� with <br /> final ��lans and specifications not being submittecl <br /> has necessitated several meetings to develop <br /> � inforraation that should have been available to <br /> Orono at an earlier date. I�Tayor Searles <br /> � continuea by stating that public interest is <br /> involved, thata <br /> • <br /> l. :le need GO days to review all material. <br /> 2 , The Orono-Long Lake interce�tor construction <br /> • as planned is incompatible with Orono° s Storm- <br /> ���ater Plan and Comprehensive Guide Plan, �,�hich <br /> � concerns itself with the environmental �rotection <br /> � of swamps and lakes, <br /> 3o Ordinance I�1oo 125 (iletlands Ordinance) has <br /> � to be observedo <br /> � (Continued) <br /> � <br />